Yingshang north station three high speed rail transit
Yingshang north high speed railway station is mainly composed of 21000 square meters of station building, 94000 square meters of station square, drop off platform, ramp, etc. After putting into operation on December 1, a number of high-speed trains will be opened to Hefei, Shanghai, Zhengzhou and other cities, greatly reducing the space-time distance with the Yangtze River Delta and the Central Plains Economic Zone. To this end, Yingshang will speed up the improvement of the road network construction in the new high-speed railway area, including the construction of supporting projects such as the station square, yingtie 1st Road, YingGAO 3rd road, etc., such as transportation, water supply and drainage, greening and lighting, which are progressing smoothly. Two new social vehicle parking lots with an area of 12200 square meters, a new taxi parking lot with an area of 4220 square meters, a new bus parking lot with an area of 4220 square meters, and supporting electric vehicle charging piles, power supply and distribution and other service guarantee facilities.
in addition, Yingshang County timely adjusted and improved three bus lines to Yingshang North Station of high-speed railway. Normal operation service time: 6:30 a.m. - 18:30 p.m. Departure interval: 15-30 minutes. Equipped with 8-meter-long pure electric buses. The specific situation of line adjustment is:
adjust 6-way bus. The original inspection station of No.6 bus terminal station will be extended northward to the electronic industrial park. Stations such as the east gate of Guanzhong new village, Guangming community and Chengnan station will be cancelled, and stations such as the north gate of Guanzhong new village, the court, the Meteorological Bureau, the east of farmer's market, Suzhou manor, Chengbei passenger station and high-speed railway station will be added. After the adjustment, the stops of bus line 6 are: Electronic Industrial Park, snack street, automobile testing station, traffic police third Squadron, Huifeng furniture, park Committee, Meteorological Bureau, Chengbei passenger station, passenger distribution center, high-speed railway station, etc. A 6031 a 6031 bus No. 11 was changed to tourist No. 3. The original bus line 11 was cancelled and renamed tourism 3. The adjusted stations are: high speed railway station, passenger distribution center, Chengbei passenger station, Guanzhong old street, balihe town government, balihe scenic spot, etc. A 6031 a 6031 adjust the No. 13 bus. The adjusted stops of No. 13 bus are: high speed railway station, passenger distribution center, Chengbei passenger station, Yingan community, Sanba community, etc.