The construction plan of Changqing Yellow River Grand Bridge project of Zhengzhou Jinan railway was approved
Recently, the Yellow River Water Conservancy Commission of the Ministry of water resources issued the decision on approval of administrative license for the construction plan of the new Zhengzhou Jinan Railway Changqing Yellow River Super Bridge project, which approved the construction plan of the new Zhengzhou Jinan Railway Changqing Yellow River Super Bridge Project in Shandong Province. The construction of the new Zhengzhou Jinan Railway Changqing Yellow River Bridge is of great significance to improve the layout of the high-speed railway network in Shandong and Henan provinces and promote the regional economic and social development of the two provinces A 6031 a 6031 Changqing Yellow River Super Large Bridge with a total length of more than 45000 meters a 6031 a 6031 new Zhengzhou Jinan railway is located in the northeast of Henan Province and the west of Shandong Province, connecting the capital of Henan Province and Shandong Province, with a Southwest northeast trend. The Shandong section of Zhengzhou Jinan Railway starts from Jinan west station of Beijing Shanghai high speed railway, runs westward to Huaiyin District, Shizhong District, Changqing District, Qihe County of Dezhou City, Chiping County, Dongchangfu District, Yanggu County and Xin County of Liaocheng City, and ends at the boundary between Shandong Province and Henan Province, with a total length of 168.583km. The total length of the bridge is 158.355km, and the bridge ratio is 94%
the Changqing Yellow River Grand Bridge announced this time is located in Changqing District of Jinan City. The total length of the bridge is 45327.41m. It is mainly set up to span G200, South-to-North Water Diversion, Yellow River, s324, old Bagong River, Main Yellow River diversion channel, new Bagong River, new zhaoniu River and other major overpasses, rivers and main channels. It is reported that the Changqing Yellow River Super Bridge will span the Yellow River in a full span manner, and cross the left bank embankment and the right bank Changqing city embankment in an overpass manner. The maximum pier height of the bridge is 33.5m, and the double track round end solid pier, double track round end hollow pier and frame pier, and the straight abutment are adopted. The construction of the new Zhengzhou Jinan Railway Changqing Yellow River Bridge is of great significance to improve the layout of the high-speed railway network in Shandong and Henan provinces and promote the regional economic and social development of the two provinces According to the environmental impact report (Draft for approval) issued by the Department of ecological environment of Shandong Province on November 7, there will be four new stations in the Shandong section of Zhengzhou Jinan railway, namely Changqing station, Chiping south station, Liaocheng west station and Xinxian station; one reconstructed connecting station is Changqing station, Chiping south station, Liaocheng west station and Xinxian station Jinan west railway station, reconstruction of Jinan railway station and Jinan regional parking lot, new Jinan west second bullet train station Among the
, Changqing and Chiping south are two sets of 4-line scale, Xinxian station is the Bureau boundary station of Jinan Railway Bureau, which is two sets of 6-line scale. The scale of Liaocheng West Railway Station in the near future is 6 sets of 15 lines (4 sets of 9 lines in Zhengji and 2 sets of 6 lines in xiongshang). In the long term, the access conditions of liaohan long high-speed railway are reserved. The reserved scale is adjusted from the original 2 sets of 4 lines to 3 sets of 5 lines, which cancels the main line connection conditions in Dezhou direction
Changqing station is an intermediate station, located at the west side of Xiaotangshan road of Wenchang office, between Liuzhuang village and Xiguan village, about 4.0km away from Changqing District government. The open space between Liuzhuang and Xiguan village of Changqing station, adjacent to Zhongchuan street and other streets of Changqing District, is convenient for the public to travel. The setting of the station reduces the demolition of the project to the greatest extent. The land occupied is mainly wasteland and vegetable land, with little impact on the surrounding environment.