The first batch of central reserve frozen pork arrived all the way to Wuhan.
At 7:15 on February 11th, the first batch of 8 refrigerated containers and 217.9 tons of central reserve frozen pork arrived at Wuhan Wu Jiashan station in Shanghai by 95001 trains. Under the strong organization of the railway department, the goods arrived at the destination 10 hours and 45 minutes earlier than expected.
The batch of frozen pork is the first batch of 2000 tons of central reserve frozen pork allocated to Wuhan by the national development and Reform Commission. After receiving the task of transportation of key materials, all departments of the railway coordinate and coordinate, adhere to the principle of special affairs and urgent affairs, open up green channels and fine transportation organization, achieve the "seven rapids" of rapid acceptance, rapid air distribution, rapid loading, rapid hanging, rapid transportation, rapid unloading and rapid delivery, and fully guarantee the safe and smooth transportation.
China Railway Wuhan Bureau Group Co., Ltd. has set up a special shift to be responsible for tracking and controlling, mastering the goods category and loading demand in advance, and fully coordinating the transportation, dispatching, freight and other departments to optimize the transportation loading and unloading plan, so as to ensure the smooth and efficient operation of all links. China Railway Special Cargo Logistics Co., Ltd. responded quickly, gave full play to the network advantages of railway transportation and the professional advantages of cold chain logistics, established a coordination mechanism for transportation support of key materials, and comprehensively focused on the transportation of key materials; actively coordinated Shanghai Railway Bureau Group Co., Ltd., Shanghai International Port group and other units, organized the connection of various links of logistics, and ensured the rapid delivery of key materials Da. China Railway Container Transport Co., Ltd. Shanghai branch actively coordinates all relevant units, and achieves fast reception, quick allocation, fast loading, fast transportation and fast transportation. The whole process is carried out 24 hours all day long power supply and refrigerating transportation, ensuring that the frozen pork chain is continuously linked and delivered at the fastest speed.
After arriving at the Wu Jiashan station, ten dozen shunting, running and freight workers who took party members' commandos as the backbone took prompt action and worked closely together. In only 30 minutes, the 8 key materials vehicles were pushed to the cargo space, and the time for quick transportation of frozen pork was gained.