From now on, Taiyuan South Railway Station will implement the new train diagram
From 0:00 on December 30, 2019, the national railway will implement the new train diagram. After the map adjustment, 263.5 pairs of passenger trains were added to the national railway, reaching 4816.5 pairs, and the railway transportation capacity was significantly improved.
among them, there will be 9 pairs of EMU trains between Taiyuan South and Datong south, with the first-class fare of 143 yuan and the second-class fare of 90 yuan.
newly added peak line Liuzhou Taiyuan South g4114 times, starting from December 30; newly added Taiyuan South Guilin North g4113 times, starting from December 31, the second-class fare is 890 yuan, and the operation time is 15 hours and 17 minutes. The main changes of
are as follows:
Taiyuan South Beijing West g630 times cancel Baoding East;
Taiyuan South Chengdu East D1903 times increase taiguxi, Pingyao ancient city, xiangfenxi, Yongji north, cancel Qixian East, hongdongxi;
Taiyuan South Xi'an north d2523 times increase Qixian East , Jiexiu East, Yuncheng north, cancel Pingyao ancient city, Linfen West;
Beijing West Chengdu T7 times increase Taiyuan, cancel Taiyuan South;
Jilin Chongqing West k1573 times increase Taiyuan, cancel Taiyuan South.
train operation section adjustment:
Taiyuan South Chongqing West d1959 / 60 operation section is adjusted to Taiyuan South Guiyang North. D1959 times from Taiyuan South to Guiyang North, opened on December 30; d1960 times from Guiyang North to Taiyuan South, opened on December 31. The d2530 / 11 operation section from North Xi'an to South Taiyuan of
was adjusted to North Xi'an to South Datong, and the train number was changed to d2584 / 3 from December 30.
another news: the reporter learned from China Railway Taiyuan Bureau Group Co., Ltd that Zhangjiakou Datong High Speed Railway (Zhangda high speed railway) was put into operation on December 30. At 18:00 on December 28, tickets for all trains on the line have been put on sale. A 6031 a 6031 Zhang Da High Speed Railway starts from Datong City, Shanxi Province, passes through Yanggao County and Tianzhen County, and ends at Huai'an County, Zhangjiakou City, Hebei Province. The total length of the line is 136 kilometers, and the design speed is 250 kilometers per hour. There are three stations in the whole line, Datong south station, yanggaonan station and Tianzhen station. After entering Zhangjiakou, it will be connected to Zhangjiakou Hohhot high-speed railway via Huai'an station and Beijing Zhangjiakou high-speed railway. After the opening of the
Zhang Da high speed railway, the operation time from Datong to Zhangjiakou is 53 minutes, and the fastest operation time from Datong to Beijing is shortened to 1 hour and 42 minutes. At the beginning of the opening of
, there will be 7 pairs of high-speed trains and 1 pair of high-speed lines. Passengers can query train number and other information through wechat of "China Railway" and railway 12306 website, wechat and client.