SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Construction of Yichang Zhengzhou Wanzhou high speed railway connecting line

2019-12-29| Pandatrips | News

The Yichang - Zhengzhou - Wanzhou high-speed rail link connecting the Shanghai - Wuhan - Chengdu Railway and the Zhengzhou - Wanzhou high-speed railway was opened in beidouping, Xingshan County, the Three Gorges Reservoir Area on Tuesday. After the completion of the line, it will form a new East high-speed railway channel in Sichuan Chongqing area together with Wanzhou Xingshan section of Zhengzhou Wanzhou railway. The

Yichang zhengwan high speed railway connecting line project is a major project to implement the development strategy of the Yangtze River economic belt and strengthen the passenger transport channel along the river. It was jointly approved by China Railway Corporation and the people's Government of Hubei Province on March 29, 2019. The total length of the line is 109.38km, which is led from Yichang east station of Shanghai Wuhan Chengdu Railway. Xiabaoping station is set through Changgangling, and Xingshan station of zhengwan railway is introduced. The estimated total investment of the project is 18.15 billion yuan, the construction period is 5.5 years, and the design speed is 350 km / h. According to

, the construction of Yichang zhengwan high-speed rail link will help optimize the national road network structure and solve the existing slow short board between Yichang and Chongqing along the river. After the completion of the connecting line, combined with Zheng Wan high-speed railway, Wuhan Chongqing will be shortened from the fastest 5 hours and 54 minutes to about 3 hours; meanwhile, Yichang Beijing will be shortened from the current 8 hours to about 4.5 hours.

Beijing

A total of 12668 trains

Wuhan

A total of 2604 trains

Chongqing

A total of 976 trains

  • Beijing
  • Wuhan
  • Chongqing
beijing-beijingdong beijing-guangzhounan beijing-chongqingbei beijing-chongqing beijing-chongqingnan beijing-chongqingxi beijing-guangzhoudong beijing-shanghai beijing-shanghainan beijing-shanghaihongqiao beijing-shanghaixi beijing-tianjinbei
wuhan-guiyang wuhan-fuzhou wuhan-shenzhen wuhan-shanghai wuhan-changshanan wuhan-guilinbei wuhan-beijing wuhan-beijingxi wuhan-yichangdong wuhan-nanchang wuhan-chongqing wuhan-suizhou
chongqing-beijingbei chongqing-beijingdong chongqing-beijing chongqing-beijingnan chongqing-beijingxi chongqing-guangzhounan chongqing-chongqingnan chongqing-guangzhoudong chongqing-shanghai chongqing-shanghainan chongqing-shanghaihongqiao chongqing-shanghaixi
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email