The first three pairs of high-speed rail from riqu section of Lunan high-speed railway to the ring line of the same station opened to traffic on May 26
On November 21, the reporter learned from China Railway Jinan Bureau group that the Rizhao Qufu section of the Jalan high speed railway (Lunan high speed railway) will be officially opened for operation on November 26. At that time, the train from Jinan to Linyi will be shortened from the fastest 3 hours and 44 minutes to more than 1 hour, and the sunshine from Jinan to Linyi is expected to be within 2 hours. In addition, after opening to traffic, Shandong high-speed railway not only forms a closed loop for the first time, but also appears a loop high-speed railway for the first time. The train starts and ends at the same station On November 26, 2016, the riqu section of Lunan high speed railway will be officially opened to traffic. At that time, our reporter will take the first train to Qufu east station for live broadcast. It is reported that Lunan high speed railway is just the name of the newly built high speed railway in the province. With the approval of China National Railway Group Co., Ltd., Lunan high speed railway has been officially named - the Juran high speed railway line, which not only includes the Rizhao Linyi section, the Linyi Qufu section, but also the Qufu Heze section and the Heze Lankao section Starting from Rizhao City in Shandong Province in the East and passing Linyi City, Jining City and Heze City in the west, the
high-speed railway is connected with the South Lankao station of Zhengzhou Xuzhou high-speed railway in Henan Province, with a total length of about 494km. The section construction mode is adopted for the high-speed railway from Rizhao to Linyi, Linyi to Qufu, Qufu to Heze and Heze to Lankao. The construction of the West Qufu east section of Rizhao was started on January 25, 2017. The east end is connected with Qingyan salt railway at Rizhao west station, and the west end is connected with Beijing Shanghai high speed railway through Qufu east station. It is a double track high-speed railway with a design speed of 350 km / H The completion of the
Jalan high speed railway will realize the circular connection with Beijing Shanghai high speed railway, Jinan Qingdao high speed railway and Qingdao salt railway in Shandong Province, thus forming a "one ring, two cores" high speed railway network in Shandong Province. After opening to traffic, the train from Jinan to Linyi will be shortened from 3 hours and 44 minutes at most to more than 1 hour, and the sunshine from Jinan to Linyi is expected to be within 2 hours Three pairs of
passenger lines took the high-speed rail to travel around qilucheng on the 21st. Reporters learned from people familiar with the matter that the timetable of the high-speed rail in Japan and Lanzhou has also been published. It can be seen from the timetable that when the high-speed railway opened on the 26th, there were 20 pairs of high-speed railway in riqu section of Lunan high speed railway, and the fastest running time from Jinan to Linyi was 1 hour and 25 minutes. At the same time, high-speed trains from Linyi north to Qufu East, Qingdao, Yantai and Weihai will be opened After the opening of
Lunan high speed railway, it has been connected with the completed Beijing Shanghai high speed railway, Qingdao salt railway, Jinan Qingdao high speed railway and Jiaoji passenger dedicated railway. For the first time, a high-speed railway circular passenger transport channel has been formed in Shandong Province, linking Jinan, Taian, Qufu, Linyi, Rizhao, Qingdao, Weifang, Zibo and other cities. It is a reality for passengers to travel around Qilu by high-speed railway
in addition, in the timetable, there are three trains that start and end at the same station: g5555 / 8 and g5557 / 6 from Jinan to Jinan, g5565 / 8 and g5567 / 6 from Jinan west to Jinan west, g5535 / 8 / 5 and g5536 / 7 / 6 from Linyi north to Linyi North. These three pairs of trains are the first ring high-speed railway in Shandong Province. At 9:00 p.m. on the 21st, the reporter inquired 12306 website, and the corresponding train number has appeared, but the ticket has not been sold yet, and the running time has not been announced A 6031 a 6031 is more convenient for Mr. Peng, who has lived in Liuji for decades, to return to his hometown. "There is no doubt that the journey back to Linyi is long when I choose part of the ring line, and the ticket price will also rise, but it also means that I have more choices. If I am in a hurry to return home, I am willing to spend more money on high-speed rail." He said.