SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Increase speed! Lunan high speed railway will be open to traffic on November 18

2019-11-01| Pandatrips | News

 

Lunan high speed railway is about to open to traffic! On October 31, the reporter learned from the first company of China Construction Eighth Engineering Bureau that five high speed railway station buildings along the line of Lunan high speed railway, namely Linyi north station, Mengshan station, Feixian north station, Junan north station and lijiazhai station, have completed static acceptance and are ready for opening to traffic. According to the plan, on November 18, the riqu section of Lunan high-speed railway will meet the traffic conditions and be officially opened to traffic in late November On the afternoon of October 31, 2016, the static acceptance of the station buildings along the

high-speed railway from Rizhao to Qufu has been completed. The reporter came to Linyi north station, Lanshan District, Linyi city. The square outside the station is basically completed, the entrance gate, elevator and display screen are in place, and the train number information can be seen on the display screen

it is reported that Linyi north railway station is the largest high-speed railway station in the whole line of Lunan high speed railway, with a construction area of 48000 square meters, including the main station building, north-south station building, supporting housing, platform canopy, which will become a large-scale hub integrating high-speed railway, intercity, subway, urban public transport and taxi. On October 17, Linyi North Station completed the static acceptance of the station building. At the beginning of November, the station will finish the work one after another Ju Fanglun, chief engineer of the first company of the eighth Construction Bureau of China
, introduced that Linyi north station is like a fast-moving high-speed railway with smooth, modern and dynamic shape, implying the city's good wish for rapid development

it is reported that in the process of construction, one company of China Construction Eighth Engineering Bureau uses the self-developed material tracing platform to realize the integrated process of high-precision design, digital processing, efficient transportation and mechanized installation, and transforms the information of steel structure components into two-dimensional code data to realize digital quality control

he introduced that in addition to Linyi north station, Mengshan station, Feixian north station, Junan north station and lijiazhai station have also completed static acceptance and are ready for traffic

Qufu, Linyi, 50 minutes to

, at 4:07 p.m. on the same day, the reporter boarded the g6959 multiple unit train at Linyi North Station of Lunan high speed railway, feeling Lunan high speed railway in advance The

train departs from Linyi north station at 4:09, arrives at Feixian north station at 4:22, reaches Sishui south station at 4:43, and reaches Qufu east station at 4:59. The fastest speed is about 310 km / h

it is reported that in the morning of October 14, with g6927 multiple units leaving Rizhao west station and running at a speed of 300 km / h to Qufu east station, the trial operation of Rizhao Qufu section of Lunan high speed railway officially entered the pre opening stage Since the joint commissioning and joint test of Rizhao Qufu section of

Lunan high speed railway was carried out on August 1, 1500 inspection trains of various types have been operated, with the inspection mileage of over 74000 km. After careful inspection of track, subgrade, bridge, communication and signal equipment, the whole line has the conditions for trial operation. The trial operation is divided into four stages: the first stage is from October 14 to 17, the second and third stages are from October 18 to 20, and the fourth stage is from October 21 to November 12. During the trial operation, the EMU will conduct time, speed, mileage and other parameter tests, fault simulation and emergency drill and train according to the diagram, and test the stability and capacity of the equipment and facilities along the line and the overall system, so as to make the new east section of Lunan high-speed railway fully meet the operation requirements A 6031 a 6031 Lunan high speed railway Linyi north station is ready for opening to traffic on November 18 a 6031 a 6031 Lunan high speed railway is an important part of the national "eight vertical and eight horizontal" railway network, starting from Rizhao City, Shandong Province in the East, passing through Linyi City, Jining City and Heze City in the west, and connecting with Lankao South Station of Zhengzhou Xuzhou high speed railway in Henan Province The total length is about 494 km. Lunan high speed railway adopts the sectional construction mode, which is composed of Rizhao Linyi section, Linyi Qufu section, Qufu Heze section and Heze Lankao section The construction of the section from Rizhao West to Qufu east of

Lunan high speed railway started on January 25, 2017. It starts from Rizhao City in the East, passes Linyi City in the West and ends in Qufu City. The total length of the line is 237.6km, with 8 stations in Rizhao West, lijiazhai, Ju north and south, Linyi north, Fei County North, Mengshan, sishuinan and Qufu East. The east end of the line is connected to the Qingyan salt railway at Rizhao west station, and the west end is connected to the Beijing Shanghai high speed railway through Qufu east station. It is a double track high-speed railway with a design speed of 350km / h

is the connecting station of Lunan high speed railway and Beijing Shanghai high speed railway. After the Lunan high speed railway is opened to traffic, the East and west station buildings of Qufu east station can be interconnected. Through the new connecting line, Lunan high speed railway and Beijing Shanghai high speed railway can also be interconnected. Some line passengers do not need to change trains, and they can reach the destination directly At 1:30 a.m. on September 6,

, with the official access of the train operation command system, it marks that the newly built Lunan high-speed railway and Beijing Shanghai high-speed railway have officially entered the "big family" of the national railway network after the interconnection

it is reported that on November 18, the riqu section of Lunan high speed railway will be opened to traffic, and it will be officially opened to traffic in late November After the opening of

Lunan high speed railway, Shandong high speed railway will become a loop for the first time, and Beijing Shanghai high speed railway, Jinan Qingdao high speed railway, Qingdao salt railway and Lunan high speed railway will form a loop. Yimeng mountain will be the first high-speed rail from Jinan to Linyi by train, which will be shortened from 3 hours and 44 minutes to more than one hour, and the time from Jinan to sunshine is expected to be shortened to less than two hours A 6031 a 6031 Li Jing, a 68 year old villager from zhupan village, baishabu Town, Lanshan District, Linyi City, said it used to take four or five hours by bus from Linyi to Jinan, and then it only takes more than one hour by high-speed rail, "it's so convenient!" when a 6031 a 6031 was opened to traffic, the e-ticket business a 6031 a 6031 was launched, according to the report, in order to accelerate the realization of service quality upgrade, the Passengers will provide more convenient services to meet the travel needs of passengers. Lunan high speed railway will open electronic ticket business at the same time as the opening of the new line. Jinan Bureau Group Co., Ltd. will gradually implement electronic ticket in the high-speed rail EMU stops

at that time, when passengers take the EMU train in the same high-speed railway section as the boarding station and the alighting station, the tickets purchased on the railway 12306 website (mobile app) and the high-speed railway passenger service station (including the ticket agency) of Lunan will be electronic tickets. After the implementation of e-ticket, the process of ticket purchase, check-in and boarding will be more convenient and efficient When the

passenger enters the station and checks the ticket, the passenger who holds the second generation ID card, permanent residence permit for foreigners, residence permit for Hong Kong, Macao and Taiwan residents, pass for Hong Kong and Macao residents to and from the mainland and pass for Taiwan residents to and from the mainland can automatically read the certificate and buy the ticket. The real name system verification, self-service check-in and out of the station can be completed through the real name system verification and the check-in gate

passengers who use other certificates to purchase tickets shall present the original valid identity documents of passengers used in ticket purchase, and the staff shall scan the two-dimensional code of their ticket purchase information sheet or manually input their certificate number to complete the real name system verification and entrance and exit check-in procedures A 6031 a 6031 registered users on 12306.cn and successfully completed face identity verification through 12306 mobile app. After purchasing e-ticket, with the dynamic two-dimensional code generated by 12306 mobile app, it can directly go through the entrance and exit check-in procedures through the automatic check-in gate of the station, and no longer take paper tickets, which greatly saves the waiting time for passengers to arrive at the station in advance and makes the arrival more convenient It will be more convenient and fast; after the implementation of electronic ticket, the process of ticket purchase, check-in and boarding will be more convenient and fast After purchasing railway e-ticket through 12306.cn,
passengers can print or download the ticket information sheet through the website, or print it in the ticket window, automatic ticket selling / taking machine and selling point of each station without exchanging paper ticket. If the passenger needs reimbursement voucher, he / she can go to the ticket window of the station to exchange for the reimbursement voucher with the original valid ID card used during ticket purchase within 30 days before driving or from the date of taking the bus

reporter takes the test train

news link

the Heze Lankao section of Lunan high speed railway is about to start

October 24, 2019, the mobilization meeting of the Heze Lankao section of Lunan high speed railway is held in Caoxian County, Heze. The project is another high-speed rail access project in our province The section from Heze to Lankao of

Lunan high speed railway starts from Heze east station, passes through Mudan District, development zone, Dingtao District, Caoxian County, Dongming County, Lankao County, Kaifeng City, Minquan County, Shangqiu City, and ends at Lankao South Station of Zhengzhou Xuzhou passenger dedicated railway. The main line is about 85 kilometers long, with a total investment of 11 billion yuan and a design speed of 350 kilometers. Heze east station, zhuangzhai station and Lankao station are set up along the whole line Kaonan station, 3 stations

on June 11 this year, the first box girder of hexu section of Lunan high-speed railway of China Railway 10th Bureau was successfully erected, and the construction of box girder erection along the whole line began. According to the plan, the Hezhou Quzhou section of Lunan high speed railway will be opened to traffic in 2021

it is reported that the construction of railway projects under construction in the whole province has been accelerated in an all-round way this year. In the first three quarters, a total investment of 30.3 billion yuan has been completed, an increase of 21.7% year-on-year, and 92% of the annual investment plan has been completed. Among them, five high-speed railway projects, Rizhao Linyi section, Linyi Qufu section, Qufu Heze section, Weilai high-speed railway and Jilai high-speed railway, have completed investment of 19.7 billion yuan, construction mileage of 640 kilometers, and total investment of 92.7 billion yuan. (source: life daily)

Linyi

A total of 84 trains

Shangqiu

A total of 4 trains

Kaifeng

A total of 404 trains

Qufu

A total of 52 trains

Jinan

A total of 2200 trains

  • Linyi
  • Shangqiu
  • Kaifeng
  • Qufu
  • Jinan
linyi-yishui linyi-jinan linyi-beijing linyi-qingdao linyi-taian
shangqiu-qingzhoushi
kaifeng-zhengzhou
qufu-taian
jinan-beijing jinan-taishan jinan-qingdao jinan-linqing jinan-taian jinan-weifang jinan-tianjin jinan-linyibei jinan-shanghai jinan-nanjing jinan-yantai jinan-nantong
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email