Two high-speed railways enter into operation test stage
At 8:00 on October 24, the g55422 train started from Hefei South Railway Station and went north along the first high speed railway of Shanghe Hangzhou, heading for Fuyang, Bozhou and other directions. This marks that the Shanghe Hangzhou high speed railway Shanghe section and the section under the jurisdiction of China Railway Shanghai Bureau Group Co., Ltd. of Zhengfu high speed railway have officially entered the operation test stage.
According to
, the two sections of high-speed railway have entered the stage of joint commissioning and test since August 20. As of October 19, a total of 1394 test trains have been put into operation in the joint commissioning and joint test of Hefei Beicheng Lumiao section of Shanghe Hangzhou high speed railway, with a total detection mileage of 90802 km; a total of 572 test trains have been put into operation in the joint commissioning and joint test of the West Fuyang section to the South Jieshou section of Zhengzhou Fuyang high speed railway, with a total detection mileage of 38678 km. The two lines can complete all joint commissioning and joint test tasks safely, with high quality and high efficiency, and can enter the operation test stage. The
Shanghai Hangzhou high speed railway and Zhengzhou Fuyang high speed railway will form a new fast passenger transport channel between the central and western regions and East China after opening and operation in Fuyang, and will be interconnected with the Yangtze River Delta railway network, which is of great significance for the realization of passenger and freight distribution of the second channel in East China, targeted poverty alleviation, and regional development towards higher quality integration.