The operation schedule of Guangzhou Metro Line 9 is attached with the whole route map
Guangzhou Metro Line 9 is one of the lines completed and operated by Guangzhou Metro. It was put into trial operation on December 28, 2017, with the sign color of mint green. Guangzhou Metro Line 9 starts from Gaozeng station, passes through Baiyun District and Huadu District, runs through Huadu automobile industry base, North Guangzhou station area and Guangzhou Airport Economic Zone, and ends at feigeling station, which is roughly in the east-west direction of "convex character". As of July 2018, Guangzhou Metro Line 9 has a total length of 20.1km, all of which are underground lines; there are 11 stations, all of which are underground stations; 6-car B-type trains are used.
Operation schedule of Guangzhou Metro Line 9
Route map of Guangzhou Metro Line 9
Station of Guangzhou Metro Line 9