Brief introduction of Guangzhou Metro Line 8 attached with route map of Guangzhou Metro Line 8
Guangzhou Metro Line 8 is the eighth line completed and operated by Guangzhou Metro. On September 25, 2010, the first phase of operation (from Changgang station to Wanshengwei station) was split and opened. On November 3, 2010, the West Extension Project (from Fenghuang new village station to Changgang station) was opened and opened. On December 28, 2019, the extension project (from Fenghuang new village station to Cultural Park Station) was opened and opened. The sign color is blue-green.
Guangzhou Metro Line 8 starts from the Cultural Park Station, passes through Liwan District and Haizhu District, runs through Guangzhou International Convention and Exhibition Center and along Xingang Road, and ends at Wanshengwei station, with a "L-shaped" East-West trend.
Route map of Guangzhou Metro Line 8
Station of Guangzhou Metro Line 8
Note: Monday
2 Friday peak time: 06:30
109:30, 15:30
120:00 interval 4 minutes middle peak time: 06:00
106:30, 09:30
115:30, 20:00
121:00 interval 4 minutes 30 seconds low peak time: 21:00
123:40 interval 6 minutes 30 seconds
Peak time on Saturday and Sunday: 08:30
119:30 time interval 4 minutes middle peak time: 07:30
108:30, 19:30
121:00 time interval 4 minutes 30 seconds low peak time: 06:00
107:30, 21:00
123:40 time interval 6 minutes 30 seconds
Please pay attention to the operation announcement of each site during holidays