2020 Guangzhou Metro Line 4 route map line 4 station
Guangzhou Metro Line 4 is one of the lines operated by Guangzhou Metro. The first section (Wanshengwei station to Xinzao station) was opened on December 26, 2005; the second phase of the first section (Xinzao station to Huangge station) was opened on December 30, 2006; the second phase of the whole line (Wanshengwei station to Jinzhou station) was opened on June 28, 2007; the north extension section (chepi station) was opened on September 25, 2010 From south station to Huangcun station); on December 28, 2017, Nanyang section (from Jinzhou station to Nansha passenger port station) was opened for operation, with the sign color of green. Guangzhou Metro Line 4 starts from Huangcun station, passes through Tianhe District, Haizhu District, Panyu District and Nansha District, and ends at Nansha passenger port station, which is generally north-south trend.
2020 Guangzhou Metro Line 4 full route map
Station of Guangzhou Metro Line 4
Note: Monday
2 Friday peak time: 07:00
109:30, 16:30
120:00 time interval 4 minutes 30 seconds middle peak time: 09:30
116:30, 20:00
121:00 time interval 6 minutes low peak time: 06:21
107:00, 21:00
122:15 time interval 7 minutes 30 seconds
Peak time on Saturday and Sunday: 08:00
120:00 interval: 4:30, middle peak time: 06:21
108:00, 20:00
121:00 interval: 6 minutes, low peak time: 21:00
122:15 interval: 7:30, yellow village only drives to Xinzao at 22:40
122:15. Please pay attention to the operation announcement of each site during holidays.