SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Yanggao thermal power plant project Department of China Railway No.6 Engineering Group resumed the blocking construction of wangguanrentun station of Beijing Baotou line

2019-12-19| Pandatrips | News

 

Under the careful organization of leaders at all levels of China Railway No.6 engineering group and with the strong support and cooperation of relevant units of Taiyuan Railway Bureau, as of 14:35 on December 19, with the completion of vehicle test, tongmeiyang high heat power plant project railway special line project Beijing Baotou line Yanggao zhoushizhuang was constructed by Yanggao thermal power plant project Department of Luqiao company of China Railway No.6 Engineering Group Co., Ltd The closure construction of wangguanrentun station of Beijing Baotou railway resumed 15 minutes ahead of schedule. In the early stage of the construction of

blockade, the leading group of Yanggao thermal power plant project department, led by fan Yue, the leader in charge of road and Bridge Company of China Railway No.6 engineering group, closely focused on the goal of ensuring the safety, quality and progress of the construction project, conducted advanced command, careful deployment and multiple measures simultaneously, constantly improved the construction organization and refined the construction scheme, and completed the following work in just 70 days: subgrade, Remove 838m of track, 2200m of newly laid track and 30000m3 of earthwork; remove 4 existing bridges and culverts and 4 new bridges and culverts; remove all existing catenary within the construction scope of blockade and 8200m of new catenary. To restore the construction conditions of wangguanrentun station blockade of Beijing Baotou railway. During the construction of

blockade, all the soldiers and men participated in the war worked hard and bravely to be the first according to the requirements of "time is continuous, space is full, limit is challenged and victory is guaranteed". During the 9:30-14:50320 minutes of blockade, we braved the severe cold, continuous operation, unity and cooperation, braved dedication, and dared to overcome the interference of short blockade time, high technical requirements, cross operation, high safety risk, heavy workload, winter construction, etc., and completed the connection of 328km950m-328km700m, 327km500m-327km250m, totaling 655m Big machine tamping; coordinate with the adjustment of public works contact network, dismantle 4 km of temporary line bearing conductor, erect and adjust 5.8 km of whole station bearing conductor, adjust 9 groups of soft span; open new microcomputer interlocking, logic check function of wangguanrentun station to Yanggao direction (temporarily not open to zhoushizhuang station), interlocking test of whole station signal equipment, signal equipment connection between zhoushizhuang and wangguanrentun to Yanggao station Lock test, logic inspection test, cooperation test of zhoushizhuang and Yanggao stations, LKJ data replacement and software replacement: change and modify tDCS and centralized signal monitoring system software; dismantle 3289 and 3292 section signal and track equipment; 3266 section moves to Beijing through the signal and track equipment for 44 meters, indoor one to one transition condition; Fas equipment is enabled, channel commissioning, access Station radio, dispatching communication system and telephone exchange system. The project Department of Yanggao thermal power plant has achieved the goal of "working hard for 70 days and opening up with all efforts".


editor: Zhang Jing
photographer: Zhang Jing

Beijing

A total of 12668 trains

Taiyuan

A total of 316 trains

  • Beijing
  • Taiyuan
beijing-beijingdong beijing-guangzhounan beijing-chongqingbei beijing-chongqing beijing-chongqingnan beijing-chongqingxi beijing-guangzhoudong beijing-shanghai beijing-shanghainan beijing-shanghaihongqiao beijing-shanghaixi beijing-tianjinbei
taiyuan-wutaishan taiyuan-pingyaogucheng taiyuan-datong taiyuan-tianjin taiyuan-beijing taiyuan-xinyang taiyuan-shanghaihongqiao
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email