Zhang Hu high speed railway starts to run according to the chart
Zhangjiakou News Network (reporter Ma Mingming) recently, Zhang Hu high-speed railway started running test according to the map, which is a step closer to the opening at the end of the year. After the connection of Zhang Hu high speed railway and Beijing Zhang high speed railway, the operation time from Hohhot to Beijing will be greatly shortened, and the fastest operation time will be shortened from more than 9 hours now to 2 hours and 18 minutes. The running test of
according to the figure is a comprehensive "practical" test on the aspects of high-speed railway transportation organization, train receiving and departure, operation density, equipment status, etc., simulating the formal opening situation of the line, which will lay the foundation for the operation of the whole line of Zhangjiakou Huzhou high-speed railway.
Zhangjiakou Huzhou high speed railway is an important part of Jinglan channel, the main channel of "eight vertical and eight horizontal" high speed railway in the national medium and long term railway network planning, with a total length of 286.8km and a designed train speed of 250km / h. After opening and operation, the passengers in Beijing Tianjin Hebei area can realize the "one-day tour" of Inner Mongolia ancient prairie. By the end of this year, Zhang Hu high speed railway will be put into operation simultaneously with Beijing Zhangjiakou high speed railway and Dazhang high speed railway.