SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Test run of Zhang Hu high speed railway from Hohhot to Beijing in 2 hours and 18 minutes

2019-12-13| Pandatrips | News

 

At 10:36 a.m. on December 11, g2045 Fuxing train from Beijing North railway station smoothly entered Hohhot east railway station and completed the first full line operation test according to the drawings. A 6031 a 6031 Chinese railway has just been officially announced, and Zhangjiakou Hohhot high-speed railway has been put into operation according to the plan, which is getting closer to the end of the year. At the end of this year, Zhangjiakou Huzhou high speed railway will be put into operation simultaneously with Beijing Zhangjiakou high speed railway and Dazhang high speed railway. Between Hohhot and Beijing, about 20 pairs of trains are expected to be arranged daily. The running test of

Zhangjiakou Huzhou high speed railway and Beijing Zhangjiakou high speed railway according to the drawing marks the countdown of the opening and operation of the first high speed railway into Beijing in Inner Mongolia. A 6031 a 6031 the distance between the central and western regions of Inner Mongolia and Beijing Tianjin Hebei region will be greatly shortened. The operation time from Hohhot to Beijing will be greatly shortened after the high-speed railway Zhang and Beijing Zhangjiakou are connected. The fastest running time will be reduced from more than 9 hours to 2 hours and 18 minutes.

according to the introduction, the operation test according to the diagram is a comprehensive "practical" test on the aspects of high-speed railway transportation organization, train receiving and departure, operation density, equipment status, etc., simulating the formal opening situation of the line, which will lay the foundation for the operation of the whole line of Zhangjiakou Huzhou high-speed railway.

Zhangjiakou Huzhou high speed railway is an important part of Beijing Lanzhou channel, the main channel of "eight vertical and eight horizontal" high speed railway in the national "medium and long term railway network planning". The design speed is 250km / h. After the opening and operation, the passengers in Beijing Tianjin Hebei area can realize the "one-day tour" of Inner Mongolia prairie. The "jinfenghuang" cr400bf multiple unit train of Fuxing is adopted in the operation test of

.

Beijing

A total of 12668 trains

  • Beijing
beijing-beijingdong beijing-guangzhounan beijing-chongqingbei beijing-chongqing beijing-chongqingnan beijing-chongqingxi beijing-guangzhoudong beijing-shanghai beijing-shanghainan beijing-shanghaihongqiao beijing-shanghaixi beijing-tianjinbei
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email