Fuxing! Hohhot is coming to Beijing high speed railway
At 10:36 on December 11, the g2405 Fuxing train, which started from the north of Beijing, smoothly entered Hohhot east station and completed the first full line operation test according to the diagram, marking the countdown of the opening of Hohhot Beijing high-speed railway.
Inner Mongolia's first high-speed railway to Beijing is composed of Zhang Hu high-speed railway and Jing Zhang high-speed railway. It is an important part of the Beijing Lanzhou channel in the "eight vertical and eight horizontal" of the medium and long term railway network planning. Based on the condition that the joint commissioning and test line has reached the opening conditions, this test is to simulate the formal opening operation situation, and comprehensively test the transportation organization, train receiving and departure, operation density, equipment status and other aspects of the high-speed railway between Beijing North and Hohhot East, thus laying the foundation for the opening operation of the whole line. After the
is put into operation, about 20 pairs of high-speed rail trains will be organized to run between Hohhot and Beijing every day. Cr400-bf type Fuxing EMU will be used to realize the "public transportation" travel of high-speed rail. The fastest running time will be shortened from more than 9 hours now to 2 hours and 18 minutes. (Yu Tao, financial media reporter of Inner Mongolia Daily)