SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

The first high-speed railway from Inner Mongolia to Beijing has entered the stage of operation test according to the drawing

2019-12-12| Pandatrips | News

 

On December 11, the reporter learned from China Railway Hohhot Bureau Group Co., Ltd. that at 10:36 a.m. on December 11, g2045 Fuxing train, which started from Beijing North, drove smoothly into Hohhot east station, completed the first operation test of the whole line according to the diagram, marking the countdown of the operation of Hohhot Beijing high-speed railway.

it is reported that the first high-speed railway to Beijing in Inner Mongolia is composed of Zhang Hu high-speed railway and Beijing Zhang high-speed railway, which is an important part of the "eight vertical and eight horizontal" Beijing Lanzhou channel in the "medium and long term railway network planning". Based on the condition that the joint commissioning and test line has reached the opening conditions, this test is to simulate the formal opening operation situation, and comprehensively test the transportation organization, train receiving and departure, operation density, equipment status and other aspects of the high-speed railway between Beijing North and Hohhot East, thus laying the foundation for the opening operation of the whole line. After the operation, there will be about 20 pairs of high-speed rail trains between Hohhot and Beijing every day, all of which will adopt cr400-bf type Fuxing EMU to realize the "transit" travel of high-speed rail. The fastest running time will be shortened from more than 9 hours now to 2 hours and 18 minutes. The section from Wulanchabu to the east of Hohhot has been put into operation in August 2017. The section from Zhangjiakou to Wulanchabu is planned to be put into operation simultaneously with the Beijing Zhangjiakou high speed railway by the end of this year. The opening and operation of the first high-speed railway from Inner Mongolia to Beijing will greatly close the connection between the central and western regions of Inner Mongolia and the Beijing Tianjin Hebei region, and greatly facilitate the travel of passengers along the way.

Guo Cong

Beijing

A total of 12668 trains

  • Beijing
beijing-beijingdong beijing-guangzhounan beijing-chongqingbei beijing-chongqing beijing-chongqingnan beijing-chongqingxi beijing-guangzhoudong beijing-shanghai beijing-shanghainan beijing-shanghaihongqiao beijing-shanghaixi beijing-tianjinbei
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email