The running time from Beijing to Hohhot will be greatly shortened
According to the "China Railway", today (December 11) Zhangjiakou Hohhot high-speed railway started running test according to the plan, which is another step closer to the opening at the end of the year. By the end of this year, the operation time from Hohhot to Beijing will be greatly shortened after the high-speed railway Zhang and Beijing Zhangjiakou are connected. The fastest running time will be reduced from more than 9 hours to 2 hours and 18 minutes. At 10:36 a.m. of
, g2045 Fuxing train from Beijing North railway station smoothly entered Hohhot east railway station and completed the first operation test of the whole line according to the drawings.
according to the introduction, the operation test according to the diagram is a comprehensive "practical" test on the aspects of high-speed railway transportation organization, train receiving and departure, operation density, equipment status, etc., simulating the formal opening situation of the line, which will lay the foundation for the operation of the whole line of Zhangjiakou Huzhou high-speed railway.
Zhangjiakou Huzhou high speed railway is an important part of Beijing Lanzhou channel, the main channel of "eight vertical and eight horizontal" high speed railway in the national "medium and long term railway network planning". The design speed is 250km / h. After the opening and operation, the passengers in Beijing Tianjin Hebei area can realize the "one-day tour" of Inner Mongolia prairie. At the end of this year, the
high-speed railway will be put into operation simultaneously with Beijing Zhangjiakou high-speed railway and Dazhang high-speed railway. It is expected that about 20 pairs of trains will be arranged daily between Hohhot and Beijing.