Suqian integrated passenger transport hub will be put into operation to connect high-speed railway
Suqian integrated passenger transport hub, which integrates railway, highway, public transportation, taxi, social vehicle and other transportation modes for zero distance transfer, is expected to be officially put into operation before December 15 to ensure seamless connection with high-speed rail traffic.
Suqian integrated passenger transport hub is located in the enclosed area of Shanghai Road, Hong Kong Road, Chaozhou road and xusuhuai salt railway. The construction content mainly includes transfer center, station square, underground parking lot and Shanghai Road (high-speed railway station connecting line) and other ancillary works.
▲ Shanghai Road (connecting line of high-speed railway station) of Suqian comprehensive passenger transport hub, as the station front road of high-speed railway station, undertakes most of the traffic of high-speed railway station and comprehensive passenger transport hub. The line is connected with Yingbin Avenue and Shanghai road. It is connected to the east by viaduct. It crosses century avenue, people's Avenue and development avenue in turn and is grounded. The total length of the line is about 3.41km. At present, it has been handed over for acceptance and put into use. A 6031 a 6031 ▲ Shanghai Road (connecting line of high speed railway station) night view a 6031 a 6031 transfer center's building roof corresponds to the overall form and structure of high speed railway main station building, and the overall design is "context vein". The "one continuous line" free curve scheme shows the Chu and Han architectural culture in the center. It looks like a Chinese style house without losing the modern flavor.
▲ the ground pavement of the square in front of the station
of the transfer center presents the shape of "wine cup", showing the city concept of "living in the capital of Chu Fengshui culture and enjoying the new appearance and high-speed life of the new city".
▲ station square
has a taste of the external shape of the city's comprehensive passenger transport hub. Next, let's follow Xiaobian to have a look at the underground engineering bar. The underground floor of
is a vehicle parking area, which is divided into five areas a / B / C / D / E, with about 780 parking spaces.
▲ the underground parking lot
is also equipped with commercial area and pedestrian passage on the underground floor to meet the travel needs of passengers and facilitate the passengers to arrive at the transfer center as soon as possible. A 6031 a 6031 ▲ the first underground floor of Station West Road Pedestrian passage a 6031 a 6031 an electronic screen is set up on the first underground floor to synchronously project information with the electronic screen on the second floor of the ground, so as to facilitate passengers to know the travel time of vehicles and plan the travel plan.
▲ the electronic screen on the first floor of the underground,
, has seen the underground project, and the editor can't help but feel excited.
go inside the transfer center to see what other functions are available. On the first floor of the ground, there are bus waiting area, passenger ticket sales, luggage consignment, monitoring center, etc. passengers can purchase tickets in the hall on the first floor and take the elevator to the second floor.