After the opening and operation of Wuhan Shiyan high speed railway, the time from Wuhan to Shiyan will be shortened to 2 hours and 1 hour to Xiangyang
The new Xiaogan Shiyan section of Wuhan Shiyan high speed railway is a double track passenger dedicated line with a maximum design speed of 350 km / h. The section from Xiaogan to Shiyan starts from Xiaogan east station of Wuxiao intercity railway and ends at Shiyan east station in Shiyan area. The main line is 399.126km long. There are 13 stations along the line, including Xiaogan East (existing station), Pengxing (reserved station), Yunmeng East, anluxi, Suizhou south, suixian County, Zaoyang (parallel station with existing Zaoyang station), Xiangyang East, Longzhong (temporarily not handling passenger transport business), Gucheng north, Danjiangkou, Wudang Shanxi, Shiyan East, among which Yunmeng East, anluxi, Suizhou south, suixian County, Zaoyang (parallel station with existing Zaoyang) are newly built 10 stations in Xiangyang East, Gucheng north, Danjiangkou, Wudang Shanxi and Shiyan East. Liu Jie