SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

New progress of Nanchong to middle section of hanba Nanping Railway: to be started in December 2019

2019-11-23| Pandatrips | News

On November 21, Sichuan online learned from the Department of ecological environment of Sichuan province that the environmental impact report of the newly built Hanzhong Bazhong Nanchong railway Nanchong Bazhong section submitted by hanbanan Intercity Railway Co., Ltd. has passed the EIA reply. At the same time, the project is preparing for the pre selection of the qualification of the general contractor for the pre station construction The middle section of Nanchong Bazhong high speed railway of

is located in Nanchong City and Bazhong City, Sichuan Province. The line is led from Nanchong North Station of Lanzhou Chongqing railway, passing through Shunqing District, Pengan County, Nanbu County, Yilong County, Enyang District, Bazhou District and economic development zone of Nanchong City, and then connected to Bazhong east station to the design terminal point. The total length of the main line is 147.723km, including 102.393km in Nanchong City and 45.330km in Bazhong City

on October 10, the prequalification notice of total price contracting for the construction of Nanchong Bazhong section of the new Hanzhong Bazhong Nanchong railway was officially released. From the content of the pre qualification documents, it is known that the total construction period of the project is 54 months, the planned commencement date is December 2019, and the planned completion date is may 2024. After completion and opening to traffic, the shortest operation time from Bazhong to Nanchong is about 35 minutes, from Bazhong to Chengdu is about 145 minutes, and from Bazhong to Chongqing is about 105 minutes. After the completion and operation of Chengdu NANDA Wanzhou railway, the operation time from Bazhong to Chengdu can be shortened to about 75 minutes A 6031 a 6031 Han Ba Nan high speed railway from Nanchong to the middle section of Ba is a national medium and long term railway network planning and Chengdu Chongqing inter city railway construction planning (2015-2020) planning project. The project is connected with the xi'an-chengdu passenger dedicated line and the planned Baohan railway, Lanzhou Tianhan railway in the north, Lanzhou Chongqing railway in the South and the planned Chengdu Dawan railway in the south. After the completion of the project, the rapid passenger transport channel between the southwest and Guanzhong, Longdong, North China, northeast and Ningxia will be constructed with the relevant channels, which will improve the coverage of the railway network in the central and western regions, improve the intercity railway network in Chengdu Chongqing region, and further strengthen the Sichuan Chongqing railway network The rapid passenger transport network in the eastern region can promote the rapid development of the economic zone in the northeast of Sichuan, accelerate the integration into the Chengdu Chongqing and guantian urban agglomerations, especially for breaking the traffic bottleneck in the old revolutionary areas of Sichuan and Shaanxi, accelerating the poverty alleviation and prosperity of the old revolutionary areas along the line, and promoting the revitalization and development of the old revolutionary areas of Sichuan and Shaanxi

it is understood that the project is located in Nanchong and Bazhong City, including the main line, lanyuchang connecting line, EMU running line, four new stations and one storage yard A 6031 a 6031 a 6031 main line, of which the newly built main line is 147.723 km, is designed as double line of EMU traction passenger dedicated line with a design speed of 250 km / h. The main line starts from Nanchong north station and ends at Bazhong east station. It passes through Shunqing District, Peng'an County, Nanbu County, Yilong County, Enyang district and Bazhou District of Nanchong City. There are 103 bridges / 42.528km, 53 tunnels / 58.955km, and the bridge tunnel ratio of the main line is 68.7%, mainly ballasted track A 6031 a 6031 Lan Yu Chang tie line a 6031 a 6031 Lan Yu Chang tie line is a single line design, with a length of 4.269 km, a design speed of 80 km / h, 6 bridges / 2.119 km and 1 Tunnel / 175 M A 6031 a 6031 motor car running line a 6031 a 6031 motor car running line is a single line design with a length of 3.011 km, a design speed of 80 km / h, two bridges / 908.2 m and one tunnel / 465 M A 6031 a 6031 station a 6031 a 6031 has 6 stations in total, including 4 stations of Muba station, Yilong station, Ma'an station and Enyang station, 2 stations of Nanchong north station and Bazhong east station, 4 traction substations (the electromagnetic environment impact of traction substations will be evaluated separately), track laying base, beam (storage) yard, sleeper Prefabrication Yard and concrete yard Concrete mixing station, filler mixing station, waste disposal area, construction camp, construction access road, etc. The total investment of the project is 22.607 billion yuan, including environmental protection investment of 724.1597 million yuan A 6031 a 6031 main station overview: a 6031 a 6031 1 1, Nanchong north station a 6031 a 6031 Nanchong north station is the passenger transport intermediate station of Lanzhou Chongqing railway, mainly dealing with the passenger transport operation of Lanzhou Chongqing railway. The total scale of the station is 5 sets and 11 lines. Now there are 7 arrival departure lines (including 2 main lines), 1 basic platform, 2 Intermediate platforms and 2 passenger underpasses. Two intermediate platforms are reserved The scale of

Nanchong north station meets the recent passenger demand of the project. The scale of the existing Nanchong north station is maintained in the project, and the line is introduced from the throat of the north side of the existing station

2, Muba station

station is located 1km northwest of Muba Township, Peng'an county. The maximum number of passengers gathered is 700. There are 4 arrival departure tracks (including 2 main lines), 1 basic platform and 1 intermediate platform, 2 platform canopy and 1 passenger underpass A 6031 a 6031 3 and Yilong station a 6031 a 6031 station are located in Yunfeng village, longxinzheng Town, Yilong County, Nanchong City, 1.6km away from Yilong county government. The maximum number of passengers is 1200. There are 4 arrival departure tracks (including 2 main lines), 1 basic platform and 1 intermediate platform, 2 platform canopy and 1 Tourist Tunnel A 6031 a 6031 4, a 6031 a 6031 Ma'an station is located 1.5km north of Ma'an Town, Yilong county. The maximum number of passengers gathered is 800. There are 4 arrival departure tracks (including 2 main lines), 1 basic platform and 1 intermediate platform, 2 platform canopy and 1 passenger underpass

5, Enyang station

Enyang station is located in Yuanwo village, Enyang, 2.6km away from the urban area of Enyang. The maximum number of passengers is 800. There are 4 arrival departure tracks (including 2 main lines), 1 basic platform and 1 intermediate platform, 2 platform canopy and 1 underground passenger passage

6, Bazhong east railway station

Bazhong east railway station is the passenger and freight station of Bata railway, but at present, it only deals with freight operation. Existing station scale: 4 arrival departure tracks (including 1 main line), 1 Basic passenger platform, 2 freight tracks, 2 freight platforms, 1 lead out line and 1 safety line. In the project, a new high-speed parking lot in the north of the existing station will be built, with a total scale of 3 sets of 7 lines (including 2 main lines). In the near future, the arrival departure line 3 (excluding the main line) will be built, with one basic platform for passengers and one intermediate platform for each; and the occupied existing railway station buildings and other facilities will also be built.

Chengdu

A total of 3476 trains

Chongqing

A total of 976 trains

  • Chengdu
  • Chongqing
chengdu-beijing chengdu-beijingnan chengdu-beijingxi chengdu-guangzhounan chengdu-chongqingbei chengdu-chongqing chengdu-chongqingxi chengdu-guangzhoudong chengdu-shanghai chengdu-shanghainan chengdu-shanghaihongqiao chengdu-shanghaixi
chongqing-beijingbei chongqing-beijingdong chongqing-beijing chongqing-beijingnan chongqing-beijingxi chongqing-guangzhounan chongqing-chongqingnan chongqing-guangzhoudong chongqing-shanghai chongqing-shanghainan chongqing-shanghaihongqiao chongqing-shanghaixi
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email