High speed rail is coming! Reporter visits Fuyang and Bozhou high speed railway stations
On November 20, the reporter took g55302 test run trains of Hefei Fuyang high speed railway from Hefei south station to Fuyang west station. According to the plan, on December 1, the north section of Shanghe Hangzhou high-speed railway in Hefei and Zhengzhou Fuzhou high-speed railway will be opened to traffic. As an important station along the line, what are the preparations for Fuyang west station and Bozhou south station
Fuyang west station: you can "brush your face" in 6 seconds and enter
Fuyang west station. After an hour's high-speed train ride, the reporter came to Fuyang west station. The on-site reporter saw that the construction of Fuyang west station has entered the final stage, and the infrastructure construction has been completed. Currently, the seat installation and the whole station are in progress Cleaning work. According to reports, by the end of November, Fuyang West Railway Station will be ready for operation According to Wang Qiang, director of Engineering Department of Anhui Branch of Hefei Fuzhou passenger dedicated line, Fuyang west station is an elevated station with a building area of 40000 square meters and a construction height of 37 meters. It is the largest station along the line, with one floor underground, two floors above the ground and three floors in part. The first floor of the station building is mainly the distribution hall, ticket hall, VIP waiting room, VIP Hall and its auxiliary rooms, and the second floor is mainly the elevated waiting hall and its auxiliary rooms, passenger services, etc. The "up in and down out" elevated cross line station type is adopted for the waiting room, which is divided into the entrance layer of the elevated waiting room, the ground station layer and the underground exit layer. At present, the station has passed the static acceptance and preliminary acceptance, and it is planned to be ready for operation by the end of November Fuyang West Railway Station of
high speed railway comprehensively considers that the station shapes of surrounding cities above ground level are mostly modern and simple styles, paying attention to the volume sense of buildings, and the cultural elements are mostly reflected by the general practice of interior and small-scale detail design, combined with the characteristics of large span, large volume and high height of its own station building, through the overall modeling design of the external facade and interior culture The ingenious embedding of symbols fully embodies the cultural elements of Fuyang
reporter saw that the gates here all have the function of face recognition. When passengers enter the station, they can swipe their ID card or QR code, face the gate camera, and "swipe their face" in 6 seconds. According to reports, after the opening, the station will implement electronic ticket entry. Passengers do not need to collect tickets. They can enter the station directly by swiping their ID card Chen Haibo, deputy head of Fuyang North Station of
, told reporters that the maximum number of people gathered in the design of Fuyang west station is 4000, with an average daily passenger volume of more than 40000. "The passenger streamline organization mode of up in and down out is adopted. The current scale of the station is 2 stations, 7 sets and 17 lines (including 4 main lines), with 1 basic platform and 6 intermediate stations, including 5 sets and 10 lines (1-5 stations) of Jinggang station and 2 sets and 7 lines (6-7 stations) of Zhengfu station." According to Chen Haibo, there will be two exit halls, one exit tunnel, two ticket halls and one special aisle for luggage and bags in the center of the station building A 6031 a 6031 in addition, the station is also equipped with an elevated waiting room, more than 3600 waiting seats, and a 360 ° off-line service desk of large island type 12306, which is located between the elevated waiting room Zhengfu yard and Jinggang yard. According to the latest standards, there are military waiting area, key passenger waiting area, business seat passenger waiting area, children's entertainment area and mother baby room, totaling nearly 260 square meters of "four areas and one room". In addition, 92 entry and exit gates, 10 manual self-service verification equipment, 12 manual ticket windows and 40 self-service ticket machines are set in the whole station