SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Guan Xuan: Chang Yi Chang high speed rail project is half a year ahead of schedule! Changde people can take high-speed rail at home in 2022

2019-11-20| Pandatrips | News

 

According to the conference spirit of Hunan Provincial Government on speeding up the construction of Changyi Changyang high speed railway, the construction period of Changsha Yiyang section of Changyi Changyang high speed railway will be one and a half years ahead of schedule and completed by the end of 2021; the construction period of Yiyang Changde section will be six months ahead of schedule and the whole line will be completed and opened to traffic in the second half of 2022. In the afternoon of November 18, Changde held the railway construction scheduling meeting of the whole city. Tang Zuoguo, vice mayor, put forward specific requirements on issues related to the advance of construction period The

Changyi Changsha high speed railway is an important part of Zhongyu Changxia channel, the main channel of "eight vertical and eight horizontal" in the national medium and long term railway development planning network, in which Changyi section shares the same line with Huanan channel. The project is led out from Changde station and reaches Changsha west station via Hanshou, Yiyang and Ningxiang. The total length of the main line is about 157.5km. The total investment approved for the preliminary design of Changyi Changping high speed railway is 27.727 billion yuan, including 66 kilometers in Changde, with an investment of about 10.7 billion yuan. There are three bid sections in Changde, which are jointly constructed by China Railway Third Bureau, China Railway 12th Bureau and China Railway fifth Bureau. After the completion of the project, the goal of connecting all 14 cities and prefectures of the province with high-speed rail will be achieved At the

meeting, the Municipal Railway Office conveyed the spirit of the provincial government's meeting on accelerating the construction of Chang Yi Chang high speed railway; the construction unit reported the current progress of the project, the main problems existing and the work arrangement of the next section; the relevant units directly under the municipal government and the district and county governments along the line made speeches respectively

the head of the Municipal Railway Office conveyed the spirit of the provincial government's Conference on accelerating the construction of Chang Yi Chang high speed railway Tang Zuoguo pointed out that two goals should be further defined: first, to ensure the completion and trial operation of Guizhou Zhangjiakou Changzhou Railway on December 26, and actively strive for the opening ceremony to be held in Changzhou; second, to ensure the completion and opening of Changyi Changzhou high-speed railway in the second half of 2022 and the first half of 2022. Tang Zuoguo stressed that two responsibilities should be further strengthened: first, to ensure that the tasks of each dispatching are completed in time and the responsibilities are implemented in place; second, to maintain social stability, ensure safety and quality, and effectively protect the environment in the process of railway construction and operation. In view of the next work, Tang Zuoguo requires that all work tasks should be clearly assigned by special personnel, and the scheduling of relevant units should be precise and precise, "both sides of the road and the ground", and all departments at all levels should actively strengthen contact. In addition, Tang Zuoguo also assigned eight specific tasks on the spot.

Nantong

A total of 24 trains

Changsha

A total of 4124 trains

  • Nantong
  • Changsha
nantong-qidong nantong-changsha
changsha-beijing changsha-beijingnan changsha-beijingxi changsha-guangzhounan changsha-chongqingbei changsha-chongqing changsha-chongqingxi changsha-guangzhoudong changsha-shanghai changsha-shanghainan changsha-shanghaihongqiao changsha-tianjin
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email