SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

The completion of pile foundation construction of Weihe super large bridge of Yinxi high speed railway laid a solid foundation for the completion and opening of Yinxi high speed railway

2019-11-18| Pandatrips | News

 

The last pile foundation of 310 pier of the fourth section of Weihe super major bridge of Yinxi high speed railway project undertaken by China Railway No.5 Engineering Group Co., Ltd. was poured today (November 16), marking the completion of pile foundation construction of Weihe super major bridge of Yinxi high speed railway, laying a solid foundation for the completion and opening of Yinxi high speed railway on schedule A 6031 a 6031 Yinxi high speed railway Weihe super large bridge, with a total length of 13.6km and 4370 pile foundations, including 4.16km long four sections and 1820 pile foundations, is the first large-span steel diagonal brace reinforced steel concrete composite structure four line ballasted high speed railway bridge at home and abroad. The bridge is large in volume, complex in structure, high in construction safety risk, difficult in construction organization and many external factors. It is a key and difficult control project of Yinxi high-speed railway and a key and difficult project concerned by the state

in the face of heavy construction tasks and difficulties, the constructors of China Railway No.5 Engineering Group Co., Ltd. carefully organized, scientifically managed, planned ahead, overcome difficulties, made every effort to ensure the construction safety, quality and progress objectives, and constantly updated the construction records. Qiu Wei, executive deputy manager of Yinxi Project Management Department of China Railway fifth Bureau, said that the project is expected to reach the conditions for ballasting and track laying in May next year The

Yinxi high speed railway connects the three regions of Shaanxi, Gansu and Ningxia. It is an important part of the "eight vertical and eight horizontal" high speed railway network in the national medium and long-term railway network planning, including the (yinhaitong) road. It is of great significance to form Xi'an "Mi" shaped high-speed railway hub, improve the structure of the railway network in the central and western regions, and realize the interconnection of the national high-speed railway network. Yinxi high speed railway is also the first high-speed railway for poverty alleviation in China. After its completion, the operation time of Xi'an Yinchuan railway will be shortened from 14 hours to 3 hours. It will bring new modes and opportunities to revitalize the old revolutionary base area of Shaanxi, Gansu and Ningxia, help the western development and poverty alleviation, accelerate the coordinated economic and social development, regional linkage, economic and trade exchanges, and improve people's livelihood in the western region.

Yinchuan

A total of 8 trains

  • Yinchuan
yinchuan-taiyuan
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email