Sign in

Fogot Password

or

Sign in

Have an account?
  • Home
  • Trains
  • Guides
  • PandaChecks
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • Sign up/in
  1. Home
  2. Trains
  3. Stations
  4. YinChuan Railway Station
Search trains

YinChuan Railway Station

银川 - View on map

  • Photo
  • Introduction
  • Map
  • Timetable
Images
Images
Images
Images
Images
Images
Images
Images
Images
Images
Introduction


[Station Name]: Yinchuan Railway Station
[Station Address]: Ningxia Hui Autonomous Region Yinchuan Xixia District Xingzhou North Street
[Postal Code]: 750011
[Construction Time]: 1958
[Front and Back Station]: 511 km from Baotou Station on the Baolan Line, 468 meters from Lanzhou Station Li.
[Subordinate Unit]: Lanzhou Railway Administration
[Station Grade]: Passenger and Freight Station
[Station Nature]: Interval Station, Technical Inspection Station.
[Passenger Transport Business]: Handling passenger landing; Checking baggage and parcels.
[Freight Business]: Handling the arrival of whole vehicle, part-load and container goods; Handling the storage of whole vehicle goods before shipment; Not handling the arrival of canned goods, explosives and first-class oxidant of whole vehicle.
[Railway Line]: Baolan Railway


The feasibility study report on the renovation project of Yinchuan Railway Station has recently been approved by the Ministry of Railway. A 6031 Yinchuan Railway Station was built in 1958. It integrates passengers and freight. The existing station has a total area of 3168 square meters, two waiting halls in the north and south, nine arrival and departure lines and two passenger platforms. With the rapid development of social economy in this area, the existing Yinchuan Railway Station scale and passenger and freight transport capacity can not meet the needs of development. The renovation project of Yinchuan Railway Station will involve two parts: the renovation of passenger transport facilities and the construction of a new comprehensive freight yard. Among them: the new Yinchuan Railway Station East Station 30,000 square meters, the station yard is arranged according to the final size of 7 14 lines (including the main line); in the southern part of the existing bus depot, the new bus depot will be transformed into the depot line, the total scale of construction is 12 bus depot lines, 4 depot lines, 2 air conditioning and temporary repair lines. Between Pingjibao and Shuangqukou Station, a new Yinchuan South Railway Station and a comprehensive freight yard will be built, and the original Shuangqukou Station will be closed. Seven arrival and departure lines (including the main line), four arrival and departure-storage lines, four reserved lines and one pull-out line will be set up in advance.
. The total investment of the project is 1.8 billion yuan (excluding municipal facilities such as the front square). Construction is expected to start in early 2009 and be completed and operated in 2010. A 6031 Ningxia Channel, Xinhua, Feb. 27 (Wuyong, Renqiong) On Feb. 27, Yinchuan Huochuan, with a total investment of 2.4 billion yuan, was solemnly held, marking the arrival of a railway station equivalent to the capacity of Beijing West Passenger Station in Yinchuan City, the northwest inland area. A 6031 Yinchuan Railway Station was built in 1958. It integrates passengers and freight. The existing station has a total area of 3168 square meters, two waiting halls in the north and south, nine arrival and departure lines and two passenger platforms. With the rapid development of Ningxia's social economy, the existing railway station scale and passenger and freight transport capacity can not meet the needs of development. To this end, Ningxia decided to implement the Yinchuan Railway Station Renovation Project, which was approved by the Ministry of Railways. A 6031. Lu Chunfang, Vice Minister of Railway, said at the mobilization meeting that the Yinchuan Railway Station renovation project has transformed Yinchuan Station into the only passenger station in the hub in accordance with the principle of "passenger and cargo distribution, passenger and cargo outside". The new Yinchuan Railway Station is designed to have 10 18 lines, including 30,000 square meters of East Station Building. The new Yinchuan South Station is a railway hub freight station and comprehensive freight yard. It is expected to be completed and operated in 2010.
. It is known that the maximum number of passengers admitted at a time at the renovated Yinchuan Railway Station can reach 5,000. The number of passenger trains transported daily has risen from 11 pairs at present to 30 pairs in 2020, and the number of passengers transported annually has risen from 2.18 million to 5 million in 2020. The number of long-range passenger trains will reach 70 pairs per day. In addition, the volume of goods transported has increased from 35.19 million tons to 62 million tons in 2020. Prospective cargo traffic is 100 million tons.
Qi Tongsheng, Vice-Chairman of Ningxia Hui Autonomous Region, said that after the completion of the new Yinchuan Railway Station, the modernization level of railway transport equipment in Ningxia will be greatly improved and passengers can travel conveniently, which is of great significance for Yinchuan to speed up the construction of regional railway hub and regional central city.

Tel: 0951-3922222

Map

Timetable

  • Departure
  • Arrival
yinchuan-taiyuan
beijing-yinchuan guangzhou-yinchuan shanghai-yinchuan tianjin-yinchuan chengdu-yinchuan changsha-yinchuan suzhou-yinchuan changchun-yinchuan
PandaTrips

PandaTrips provides China train tickets booking service,shares China travel information,travel plan and tour guides,helps you enjoy your trip to China.

© Copyright 2019 PandaTrips Network Co., Ltd.All Rights Reserved

Company

  • About
  • Contact
  • Booking rule
  • Privacy

Website

  • Train booking
  • Train schedules
  • Train guides
  • Travel guides

Follow us

  • Facebook
  • Twitter
  • Instagram
  • Email