SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

The capacity expansion and reconstruction of Longchang Xuyong section of longhuang railway has passed the feasibility study review

2019-11-15| Pandatrips | News

 

The reporter learned from the Sichuan development and Reform Commission that the expert group of China Railway Group appraisal center held feasibility study review meeting, group discussion meeting and consultation opinion summary meeting in Luzhou from the morning of November 12 to 14, and agreed in principle to the feasibility study report on the expansion and reconstruction of Longchang Xuyong section of Longchang Huanghe railway The section from Longchang to Xuyong of the

longhuang railway is an important part of the Western Railway channel in the national master plan of the new land and sea channel in the west, and also the bottleneck section of the recent sea freight channel from Sichuan to the Beibu Gulf of Guangxi. The implementation of the expansion and reconstruction of the project will play an important role in opening up and improving the railway sea intermodal transport corridor of Guangxi through Fangcheng port and Qinzhou port to Southeast Asia, South Asia, Australia, New Zealand and other countries and regions in the south, promoting the southwest and northwest inland areas to actively integrate into the national opening-up strategy, and fully connecting the "China Indochina Peninsula" economic corridor and the "21st century Maritime Silk Road" Make sense

next step, Sichuan development and Reform Commission will, according to the deployment and arrangement of the provincial Party committee and the provincial government, urge the design unit to complete the verification and repair of the feasibility study report as soon as possible in accordance with the feasibility study review spirit. At the same time, actively coordinate with the appraisal center of China Railway Group to issue the review opinions on feasibility study as soon as possible, and guide the local government to cooperate with the project company to accelerate the handling of the pre requisites for the approval of feasibility study, and strive to approve the feasibility study report of the project as soon as possible, so as to realize the start of construction. Chengdu Business Daily - Red Star reporter Ye Yan

Chengdu

A total of 3476 trains

  • Chengdu
chengdu-beijing chengdu-beijingnan chengdu-beijingxi chengdu-guangzhounan chengdu-chongqingbei chengdu-chongqing chengdu-chongqingxi chengdu-guangzhoudong chengdu-shanghai chengdu-shanghainan chengdu-shanghaihongqiao chengdu-shanghaixi
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email