Start of commissioning! Countdown to the opening of the new high speed rail line
The joint commissioning and joint test of Xiaogan Shiyan section of the newly built Wuhan Shiyan high-speed railway has been successfully completed, and it will enter the trial operation stage from November 1.
The Han Shi high speed railway is a double track passenger dedicated line. The newly built line is Xiaogan Shiyan section. It is connected to the completed Wuhan Xiaogan intercity railway at Xiaogan east station. The main line is 399.126 km long and the maximum design speed is 350 km / h. 13 stations including Xiaogan east station, Yunmeng east station, anluxi station, Suizhou south station, suixian station, Gucheng north station, Danjiangkou south station, Wudang Shanxi Station and Shiyan north station are set up along the whole line, including 10 new stations.
The person in charge of China Railway Wuhan bureau group company said that during the trial operation, the railway department will mainly provide time scale for the laying of train operation diagram, verify the train tracking ability of the system, test the adaptability of transportation organization of each system under normal and abnormal conditions, and test the adaptability of each system under normal and abnormal conditions, mainly through the parameter test of train operation diagram, operation test according to diagram, fault simulation and emergency rescue drill It can provide technical basis for improving scientific and reasonable transportation organization scheme.
As an important part of the national high-speed railway from Wuhan to Xi'an, Han Shi high speed railway is an important regional fast railway connecting Wuhan, Xiangyang, Shiyan and Suizhou in Hubei Province. It will also be a national strategic channel connecting central China, Northwest China and southeast coastal areas. This line is of great significance to improve the regional transportation network, facilitate the travel of passengers and improve the service quality.