The signal equipment of Weng Ma railway starts commissioning and acceptance
Yesterday, at Jiangjiaping station of wengma railway in Guizhou Province, the staff of Longli signal workshop of Guiyang electric service section of China Railway Chengdu Bureau Group Co., Ltd. and the signal equipment manufacturers carried out the final commissioning acceptance of the signal communication equipment and turnout equipment of the station, so as to ensure the early opening and operation of the railway. A 6031 a 6031 Weng Ma railway, with a total length of 73 km, was started in September 2015 with a design speed of 120 km / h. Weng'an, Pingdingying, Niuchang, fuquandong (slow opening station) and Jiangjiaping are successively set up in the whole line from north to south, which is a resource-based freight line. On July 13 this year, the Weng Ma railway was connected to the whole line. (Zeng qinzeng Ming)