SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Power centralized EMU is officially put into operation in Changbai Urumqi high speed railway

2019-10-22| Pandatrips | News

 

Changchun, China news network, Oct. 22 (Zhang Yao, Li Shujuan) at 11:10 on the 22nd, the c1553 train slowly left Changchun station and drove to the destination of Jilin Songyuan station, marking that the power centralized EMU was officially put into operation on the Changbai Urumqi express railway. Because the outer skin of the train body is painted with "Guohuai green", it is also known as "Hulk". It was also the first time that the new EMU of "Hulk" appeared in the northeast.

power centralized EMU with 160 km / h speed adopts streamline shape, which is an important part of Fuxing series products and an iterative upgrading product of passenger trains on ordinary speed lines. The EMU is based on the existing 25t type passenger car. In terms of plane layout, interior decoration, human-machine interface, etc., it is optimized with reference to the existing CRH EMU. Its power is concentrated in the head or tail of the train.

according to the staff of Changchun station, there are four "Hulk" trains in Changchun station, including Changchun Songyuan, Changchun Tongyu, Changchun Baicheng, etc. Among them, the start of "Hulk" also ended the history of no direct train from Changchun to Tongyu.

according to the reporter, the first batch of lines of the power centralized Fuxing EMU train with the speed of 160km / h also include Tongyu Baicheng, Baicheng Tongyu, Tongyu Changchun, etc. At present, China Railway Shenyang Bureau Group Co., Ltd. is in the process of designing operation chart adjustment scheme, striving to have more trains applying 160 km / h power centralized Fuxing EMU in Changbai Urumqi express railway in the near future. (end)

Jilin

A total of 68 trains

Shenyang

A total of 1404 trains

Changchun

A total of 10792 trains

  • Jilin
  • Shenyang
  • Changchun
jilin-tumen jilin-beijing
shenyang-dalianbei shenyang-dandong shenyang-qiqihaer shenyang-beijing shenyang-jilin shenyang-liaoyang shenyang-tianjin shenyang-yingkou shenyang-baihe shenyang-songjianghe shenyang-panjin shenyang-shanhaiguan
changchun-beijingdong changchun-beijing changchun-beijingnan changchun-beijingxi changchun-chongqing changchun-chongqingxi changchun-shanghai changchun-shanghainan changchun-tianjinbei changchun-tianjin changchun-tianjinnan changchun-tianjinxi
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email