Substantive progress has been made in starting Hu-Hangzhou Railway during the expropriation and relocation of Fuyang Section
The site selection of the project planning, the approval of the feasibility study report, and the approval of the construction drawings of the whole line in front of the station. Recently, Hu-Hang Railway has made substantial progress. Fuyang has held a meeting on the deployment of Hu-Hang Railway Expropriation and Relocation. The work of expropriation and relocation progress, land submission, pipeline relocation, resettlement methods and regional blocks have been deployed. Fuyang Section has officially started the expropriation and relocation work. A 6031 A 6031 Earlier, the Engineering Management Center of the National Railway Group approved the construction drawings of the whole Huhang Railway Station, which means that the Huhang Railway Project is really not far from the start of construction.
Huhang Railway (Huzhou-Hangzhou West-Hangzhou-Hangzhou-Huanghai Railway Connection Line) is 137.6 kilometers in length, of which 136.866 kilometers are newly built and the designed speed is 350 kilometers per hour. The
line starts from Huzhou Station of Ningxia-Hangzhou High-speed Railway and passes through Deqing and Yuhang to the future science and technology city of Xike Great Corridor in Hangzhou City. It then passes south through Fuyang and Tonglu to the second phase of Hangzhou-Wenzhou Railway. There are six stations (Huzhou Station, Deqing Station, Hangzhou West Station, Fuyang West Station, Tonglu East Station and Tonglu Station), of which Hangzhou City is one of them. West Railway Station, Fuyang West Railway Station and Deqing Railway Station are newly built. A 6031 A 6031 Huzhou to Hangzhou, there is a high-speed railway at present. Why should we build another one? A 6031 A 6031 This railway is more than one hundred kilometers short. In fact, it plays a very important "role" - connecting multiple railways. In the future, it will connect Shanghe-Hangzhou Railway Station, HangLinji Railway Station, Hangzhou-Wenzhou Railway Station and Shanghai-Chazhou-Hangzhou Railway Station. Its northern section, namely the section from Hangzhou West to Huzhou, is the Zhejiang section of the Shanghe-Hefei-Hangzhou Railway; its southern section connects the Hangzhou-Huangzhou Railway and the Hangzhou-Wenzhou Railway. A 6031 A 6031 Huzhou Husu Lake and Huhang Railway Construction Command said that the requisition and relocation work has started, followed by bidding links to strive for the early start of the new Fenghuangshan Tunnel and other joint projects, which are expected to be completed before the Asian Games. After the completion of the connecting line, the high-speed railway passageway from Hangzhou to the central part will be opened. At present, Hangzhou to Hefei, to bypass Suzhou, Wuxi, Nanjing, the fastest train number is G7564, the time is 2 hours and 12 minutes. After completion, the high-speed rail from Hangzhou to Hefei will arrive as soon as one and a half hours, and then go to Zhengzhou, Xi'an, Lanzhou and other places faster. A 6031 A 6031 To the south it connects the Hangzhou-Huangzhou Railway and the Hangzhou-Wenzhou Railway. Later, both the West Railway Station and the East Railway Station can go to the direction of Huangshan. The time for Hangzhou to go to Huangshan is greatly shortened, with the fastest time being only 1.5 hours.