SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Construction of jidayuan high speed railway starts

2020-07-06| Pandatrips | News

On June 30, the opening ceremony of Jining Yuanping high-speed railway via Datong was held in Shuozhou City, Shanxi Province.
China Railway Taiyuan Bureau Group Co., Ltd. and Daxi Railway Passenger Dedicated Line Co., Ltd. adhere to the quality and safety as the core, scientific organization and management, pay attention to investment benefits, promote technological innovation, protect the ecological environment, strictly abide by the honest regulations, and do a good job in the construction of jidayuan high-speed railway from a high starting point.
Jidayuan high speed railway is located in the north of North China, connecting Wulanchabu city of Inner Mongolia Autonomous Region in the north, passing through Datong City and Shuozhou City in Shanxi Province, connecting Xinzhou City in the south, and connecting Taiyuan City, the capital of Shanxi Province, through Daxi high speed railway. The new line has a total length of 269.6 km and a design speed of 250 km / h, with 8 stations.
Jidayuan high-speed railway is the backbone line of regional comprehensive transportation infrastructure, and is an important part of the main channel of "eight vertical and eight horizontal" high-speed railway in the national "medium and long-term railway network planning". After the opening of the line, the running time of trains from Hohhot to Taiyuan and Datong to Taiyuan will be shortened to 150 minutes and 76 minutes respectively.

Taiyuan

A total of 316 trains

  • Taiyuan
taiyuan-wutaishan taiyuan-pingyaogucheng taiyuan-datong taiyuan-tianjin taiyuan-beijing taiyuan-xinyang taiyuan-shanghaihongqiao
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email