SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

The second line of Yangpingguan Ankang Railway is completed

2019-12-28| Pandatrips | News

At 15:25 on December 27, 42096 trains slowly left Xixiang station, marking the completion of the national and provincial key construction projects - Yangpingguan Ankang Railway additional second line project (hereinafter referred to as Yangan second line). The

Yangan second line is located at the south foot of Qinling Mountains in China. It is led from Yangpingguan station of Baocheng railway. It is 329.87km long from Mianxian to Hanzhong basin along Hanjiang River Valley, Xixiang and Shiquan, and from Hanyin to Ankang station along Yuehe River Valley. The project was started in July 2015. It is a national class I electrified railway with a design speed of 120 km / h, a planned annual transportation capacity of over 120 million tons and a long-term capacity of over 160 million tons. Yangan second line passes through the famous Qinba mountain area and Hanzhong Basin, with complex geological structure, many unfavorable geology and special rock and soil distribution; the new line and the existing Yangan line in operation are side by side, with frequent crossing and side changing. The construction of the existing railway has a long history, some tunnels are seriously damaged, and it is difficult to connect and reconstruct. At the same time, the line crosses Beijing Kunming Expressway with high technical requirements for construction and Bridge turning; the station building reconstruction project needs to connect different standards of OCS, signal, communication, power, etc. under the condition of ensuring normal operation, so the construction is quite difficult.

PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email