SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

"Scientific prevention + on-site control" to erect the safety backbone of grassland Railway

2019-12-13| Pandatrips | News

Independent research and development of double prevention and control big data analysis, key links and key factors in advance management and control platform, and effective implementation of safety prevention mechanism - this is an innovative measure for Hohhot station to rely on physical and technical prevention means to contain key risks. Focusing on the nature of personnel decentralization and operation differentiation, we will comprehensively promote the management of three types and three levels of "key safety personnel" -- this is an excellent measure for Wuhai train depot to focus on the key and get through the "last kilometer" to ensure safety Now, the practical safety mechanism of "scientific prevention + on-site control" has been implemented in all units under the management of China Railway Hohhot Bureau Group Co., Ltd., creating good conditions for the safety backbone of grassland railway. Focusing on the subject of "how to ensure the long-term stability of the railway", the Party committee of Hohhot Bureau Group Co., Ltd. repeatedly considers the significance of "Three Guarantees and three increases" from the perspective of politics and the overall situation, and realizes that "Three Guarantees" first is to ensure safety, which is the premise and basis of all railway work, so it is necessary to firmly establish the concept of "safety without fail". They take "strengthening the foundation, focusing on the key and building the system" as the red line, and strive to improve the "scientific prevention + on-site control" safety practical mechanism, fully implement the safety production responsibility system, and fully focus on the safety of high-speed rail and passenger trains. All staff implement the "one book, three forms", firmly grasp the prevention and control of the three nodes of "before, during and after" and constantly deepen the basic construction of safety management Set up. The mission and responsibility of improving political position and pressing hard work. The Party committee of the group company of the Bureau, in combination with the theme education of "never forget the original mind and keep the mission in mind", constantly deepen the understanding of the concept of "safety without fail" in accordance with the party constitution and rules, the thought of "life first and safety first" and the requirements of adhering to the political red line and professional bottom line, hold safety management training courses in batches and organize the training of full-time and part-time safety management personnel on the basis of improving the understanding We should seriously carry out investigation and research, focus on the outstanding problems in safety production, and make measures, clear direction, make up for shortcomings and implement them. In the first batch of "don't forget the original idea and keep the mission in mind" thematic education, leaders of the group company of the Bureau conducted 642 in-depth investigations at the grass-roots level, found 1508 problems through inspection, and solved 474 problems through legislative reform. They combined the learning results with safety practice, compiled more than 120000 words of special theoretical learning materials for safety management in accordance with the decision-making and deployment of safe production of China National Railway Group Co., Ltd. and the safety management practice of the bureau group company. Adhere to prevention first and firmly hold the "baseline" of safety prevention. The prevention mechanism is aimed at the outstanding problems of "unclear and unexpected" in the field of safety production. It emphasizes that the gateway of safety production should be moved forward, from hidden danger investigation and management to safety risk management and control. The group company of the bureau adopts the methods of safety discussion, centralized discussion and on-site investigation to identify and study the safety risks throughout the whole process, build the safety risk database at different levels, and effectively manage and control the safety risks at different levels and categories; continuously optimize and upgrade the dual prevention information system, study and form the construction scheme of safety big data platform, and comprehensively promote the centralized management and comprehensive sharing of safety information, The functions of safety portrait, equipment status portrait, safety analysis management and control, risk prediction and early warning of developers, and the whole process of tracking and prompting the risk management and control status; the basic database of personnel safety portrait is established to centrally manage the information of safety production business training, health status, post adjustment, holding the standard and falling the standard, etc., to automatically identify unsafe factors and realize advanced management and control; the priority is given to construction work In the field of safety management and control, research and develop the function of automatically pushing risk management and control list, extracting historical safety production data, modeling and analyzing potential risks, continuously consolidating and strengthening the information technology means of dual prevention; in view of the changes of safety production factors and production environment, strengthen the dynamic research and accurate management and control of safety risks, organize the whole staff to study and identify 43246 high safety risks, and carry out risk management and control There are 1454 risk early warnings, prompt and effectively control more than 70 safety risks in a timely manner; all safety risk items are included in the work assignment and checklist, quantified to the post, graded and responsible, fully covered supervision and inspection, and confirmed the risk controlled state; dynamic and regular troubleshooting are carried out from the aspects of safety management, personnel quality, on-site operation, equipment quality, environmental state, etc In combination, we have carried out the investigation of potential safety hazards in different levels and under the supervision of listing, and eliminated 782 potential safety hazards. Since this year, we have rectified 79869 class B and above problems. Pay close attention to the "site, key and process" and open up the "last kilometer" main path to ensure safety. The site is the "last kilometer" of falling standards and reaching standards. The group company of the Bureau adheres to the downward shift of focus, closely adheres to the site to improve the operation standards, improve the operation instructions, and implement the management of "key safety personnel". The group company of the Bureau and relevant stations and depots shall carry out regional and post package at different levels and with fixed responsibilities, and effectively strengthen safety package protection in key periods. In this year's Spring Festival games, the national two sessions and other key periods, the group cadres spot checked 171000 people, and found more than 52000 problems. The key is to stick to the "key pass" of the safety red line and the bottom line. They highlight the safety priorities of bullet trains, buses, construction, and people, strengthen the safety of high-speed rail and passenger trains, promote the integrated management of bus servicing, participate in the joint commissioning of Zhangjiakou Huzhou high speed rail, revise 42 safety red lines of labor, construction, buses and high-speed rail, and eliminate the safety accidents above class C of responsible buses; Hold the safety standardization construction site meeting, comprehensively check and identify the key links of on-site operation, thoroughly study and judge the loopholes and deficiencies in the rules and regulations, operation standards and control measures of key operation links of card control, improve and perfect the key operation control measures, and implement the safety standardization star level staff and star work area selection activities. The process is to strictly implement the "firewall" of safety management and control measures. They actively refine the scheme and clear the objectives, promote the treatment of hidden dangers of off-road environment with high quality, strengthen the safety emergency management, implement the guidance of vehicle service professionals, launch the two-way confirmation measures of construction protection personnel and equipment management units, strengthen the supervision and inspection of construction safety, train, test and implement the construction operators Supervision and inspection shall be carried out for the formulation of construction scheme, the issuance of construction dispatching order, the establishment of protection system, the operation of Engineering train, the organization of construction site, etc. to ensure safety. With the continuous and in-depth promotion of standardized construction of safety production by grassland railway, the safety management mechanism and measures have been effectively implemented. As of December 2019, Hohhot bureau group company has achieved eight consecutive safety years.
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email