SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Weilai high speed railway starts to be laid, and will be ready for traffic by the end of 2020

2019-12-08| Pandatrips | News

 

According to Qilu one point news, on the morning of December 7, with two 500m long rails placed in place, Weilai high-speed railway officially entered the track laying stage, marking the ” middle channel of the ” three horizontal ” rapid railway network in Shandong Province, which is another substantive step away from the opening and operation. Reporter

found at the track laying site that this time, a track laying locomotive was used. The locomotive just finished the track laying task of Lunan high-speed railway, and the track laying was carried out from Northwest Station of Laixi to Weifang, with a daily track laying of 6km. It is expected that the track laying will be completed by the end of May 2020, and the opening conditions will be available by the end of the year. A 6031 a 6031 Weidu Laixi high speed railway is led from Weifang North Station of Jinan Qingdao high speed railway, passing through Changyi, Pingdu and Laixi to the East, and leading into Laixi North Station of Qingdao Rongcheng intercity. The main line is 125.757km long, which is a double track high-speed railway with a design speed of 350km / h. four stations are set up, namely, Weifang north station, Changyi south station, Pingdu north station and Laixi north station. The construction of the whole line will be started on January 1, 2018, and it is planned to meet the traffic conditions by the end of 2020. At present, the subgrade, bridge foundation, box girder erection, tunnel and other works under the track are basically completed, and the ballastless track, high-speed turnout, station building, four electric engineering and other works are under full construction, among which, the ballastless track has completed 128 single track kilometers, 59%. After the

Weilai high speed railway is opened to traffic, the trains in Yanwei area will no longer bypass Jiaozhou north station, the transportation pressure of Jiaoji passenger dedicated line will also be effectively relieved, and people in Pingdu, Yantai, Weihai and other places in Qingdao will travel more conveniently.

Weihai

A total of 188 trains

Weifang

A total of 284 trains

Yantai

A total of 20 trains

Qingdao

A total of 684 trains

  • Weihai
  • Weifang
  • Yantai
  • Qingdao
weihai-weifangbei weihai-beijing weihai-shanhaiguan weihai-jinan weihai-qingdao
weifang-shanghaihongqiao weifang-qingdaobei
yantai-shanghai yantai-rongcheng yantai-jinan yantai-penglaishi
qingdao-shanghai qingdao-jinan qingdao-yantai qingdao-weihai qingdao-dezhou qingdao-shanghainan qingdao-nanjing qingdao-yancheng qingdao-yishui qingdao-linyi qingdao-linyibei qingdao-beijing
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email