SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

The first special railway line in Harbin new area settled in Jieneng thermal power

2019-11-30| Pandatrips | News

On November 29, the railway special train carrying 4450 tons of heat and coal arrived at the plant area of Jieneng thermal power station Co., Ltd. in Harbin new area. This is the first special railway line after the establishment of Harbin new area. The use of the special railway line will greatly relieve the pressure of heating coal in Harbin new area, further improve the traffic infrastructure construction in the new area, and promote the development of the new area. The railway special line project of

Jieneng thermal power station Co., Ltd. was commenced in August 2015 with a total investment of about 180 million yuan. After the reconstruction of miaotaizi station, the special line will be connected and led out. It will turn eastward and enter the coal unloading yard at the north side of the Jieneng thermal power plant, with a total length of 1.05km. The first batch of special railway freight wagons from Inner Mongolia coal mine to Jieneng thermal power station Co., Ltd., with a total of 66 sections and 4450 tons of coal, took 8 hours to arrive in Harbin. Founded in 2002,

Jieneng thermal power station Co., Ltd. is mainly responsible for urban central heating in Songbei district and Harbin hi tech Zone. The heating area has grown from the initial 300000 square meters to the current 24.86 million square meters. Xue Haitao, general manager of

Jieneng thermal power station Co., Ltd., introduced that compared with the general road transportation of coal, railway transportation not only greatly reduces the transportation cost, reduces the transportation loss, but also avoids the adverse factors that road transportation is easy to be restricted by climate conditions and traffic time, which can greatly shorten the transportation time and effectively reduce dust pollution. The opening of the special line will provide more convenient conditions for the coal transportation of Jieneng thermal power and escort the heating of Harbin new area.

PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email