Changgan high speed railway officially enters into trial operation stage
The reporter learned from China Railway Nanchang Bureau Group Co., Ltd that on the 25th, the Changgan high speed railway entered the operation test stage
it is understood that the operation test is the best plan for the railway department to test the transportation on the basis of the line reaching the standard on the premise that the joint commissioning and test line reaches the opening conditions. In this operation test, the railway department will test the operation diagram parameters between Nanchang Station, Nanchang west station and Ganzhou west station, check the operation scale and interval time of EMU trains, and carry out fault simulation, emergency rescue drill, train operation test according to the diagram, etc.
Changgan high speed railway, with a total length of 416km and a design speed of 350km / h, starts from Nanchang in Jiangxi Province in the north and ends at Ganzhou in the south, runs through 26 counties (districts and cities) of four districts and cities, including Nanchang, Yichun, Ji'an and Ganzhou, and has 13 stations in Nanchang, fengchengdong, xingguoxi, ganxianbei and Ganzhou West After the
Chang GaN high speed railway is opened to traffic, the railway travel time between Nanchang and Ganzhou will be shortened from the current fastest 4 hours to about 2 hours. At that time, Jiangxi will realize city to city bullet trains.