SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Yunnan Lixiang railway officially enters the post station construction stage

2019-11-25| Pandatrips | News

 

On Tuesday, the reporter learned from Kunming Railway Bureau Group Co., Ltd. that Lijiang Shangri La railway in Yunnan Province (hereinafter referred to as "Lijiang Xiangli Railway") successfully erected the first OCS pillar, and the project officially entered the post station construction stage The post station project of

mainly involves communication, electric power and traction power supply, which is the key link of railway construction, with difficulties in precision control, complex construction organization, etc. For this reason, the construction unit divides the line and organizes more than 2000 people from 19 professional teams to carry out the operation at the same time to ensure the construction progress

it is reported that 989 OCS pillars, bridge steel pillars, 184km OCS, 339km high and low voltage cables, 41 communication towers, 7 power transformation and distribution substations and 10 interlocking stations need to be built in the post station project of Lijiang Xiangtan railway

"the catenary pole is the prime supporting the whole power supply network. In order to ensure the accurate control of the pole, we repeatedly measure and correct each catenary pole in the construction, and accurately position it to ensure that the vertical deviation between the pole elevation and the subgrade and the rail does not exceed plus or minus 3 mm, so as to ensure the overall smoothness and structural stability of the catenary." Yuan B, technical director of Lijiang Xiangtan Railway Project Department of China Railway Construction Electrification Bureau Group, said at the scene The main line of the

Lijiang Xiangtan railway is about 139 kilometers long, with a design speed of 120 kilometers per hour. It is an important part of the "Western Railway Network" in China's medium and long-term railway network planning. When it is completed and opened to traffic, it will end the history of no Railway in Diqing Tibetan Autonomous Prefecture of Yunnan Province As of the end of October this year, all works of the railway have been carried out as planned, with 85.4% of tunnels, 90.7% of bridges and 86.8% of subgrade completed. (end)

Lijiang

A total of 68 trains

Kunming

A total of 4364 trains

  • Lijiang
  • Kunming
lijiang-kunming lijiang-dali2
kunming-chuxiong kunming-beijing kunming-beijingnan kunming-beijingxi kunming-guangzhounan kunming-chongqingbei kunming-chongqing kunming-chongqingxi kunming-guangzhoudong kunming-shanghai kunming-shanghainan kunming-shanghaihongqiao
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email