SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Successful completion of underground foundation of Daqing Xicheng passenger transport hub project of No.2 company

2019-11-22| Pandatrips | News

 

Since the construction of Daqing Xicheng passenger transport hub project of Jixue Songliang

was started in May, it has attracted many attentions. The project builders of the second company participated in the construction carried forward the enterprise spirit of "fearless and brave to climb the peak" of the group company, paid close attention to the site management, reasonably promoted the construction plan and strictly fulfilled the contract while ensuring the safety and quality standards Duration.

the project covers an area of nearly 70000, including the building area of the station building of about 13000, the building height of 17.1 meters, the depth of the shallow foundation pit of the underground part of 8 meters, and the deep foundation pit of 12 meters. After the completion of the construction, it will comprehensively improve the travel problems of the residents in the area and share the pressure of railway passenger transportation in Daqing West Railway Station

recently, with the completion of the last concrete pouring, the deep foundation pit of Daqing Xicheng passenger hub project successfully completed the roof construction and the underground foundation construction. It marks the successful completion of the construction node period in 2019

the project encountered many difficulties in the construction process, the engineering geological conditions are complex, and the construction is difficult. The main structure of the frame is steel structure technology, the design drawing is complex, the form of foundation pit support structure is diverse, the amount of earthwork excavation in the basement is large, the construction site is narrow and small, and the working face is difficult to unfold. In the construction process, in order to complete the pile foundation construction under the cushion cap, the project department changed the working ideas, optimized the original construction scheme, and removed the optical cable concrete package under the cushion cap at the south side of zhongsan road. It solves the problem of binding the working surface Since the commencement of

, all staff of the project have been united, never forgetting their original intention, keeping in mind their mission, overcoming difficulties, and strictly following various construction requirements. With the cooperative mode of "large machinery main body excavation, small equipment sliding operation", the construction team shifts round the clock, and people and machines stop working. At the same time, the project department strictly implements the 9000 management system, actively promotes the safety standardization management mode, and strives to build excellent projects. Under the premise of ensuring the construction period and quality, the goal of "zero accident in safety production" is achieved. The project manager also demonstrates and adjusts the general schedule and details for many times to ensure the scientificalness and rationalization of the construction steps. Finally, the annual construction plan issued by the construction unit was completed in advance. We have achieved phased results and made full preparations for the resumption of work next year The builders of Daqing Xicheng passenger transport hub project of

No.2 company kept improving and paid attention to environmental protection in the construction process, increased investment in the "dust prevention and noise reduction" link, and both indexes met the qualified standards of Daqing Environmental Protection Bureau. This was affirmed and praised by the owner Daqing Transportation Bureau. It has laid a solid foundation for realizing the rolling development of the second company in the field of municipal engineering in Heilongjiang Province.

PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email