The first blizzard in 2019
On the night of November 17, Mudanjiang District experienced the strongest snowfall since the beginning of winter, with the snow thickness generally over 15 cm. Mudanjiang locomotive depot started the emergency plan for snow removal in time to organize snow removal. More than 2000 cadres and workers in the whole section took snow as their order. On the basis of snow removal in corresponding plant areas, 90 groups of electric switches, 12 groups of manual switches and 2 groups of electric switches in the section area and four different workshops were grouped The turnouts of special lines shall be cleaned intensively, and the driver shall be arranged to take 8 additional passenger and freight locomotives out of the depot safely to ensure the smooth operation of the train.
by Dong Zhiguo and Qin Guozhong