Two more railways in Jiangsu have entered the stage of operation test. Five cities in Northern Jiangsu will usher in the era of high-speed rail
Since November 13, 2019, HSR of Xuyan and Lianzhen (Lianhuai section) has entered the operation test stage of EMU The
HSR starts from the East Xuzhou station and ends at the Yancheng station of Xinchang railway. It runs across the coastal and hinterland of Northern Jiangsu Province and is known as the "golden belt" of Northern Jiangsu Province. The total length of the main line is 315.55km, and the design speed is 250km / h. It has 10 stations including Xuzhou East, houmazhuang, Guanyin Airport, Suining, Suqian, Siyang, Huai'an East, Funing south, Jianhu, Yancheng, etc
Lianzhen high speed railway is connected with Longhai Railway and Qingyan salt railway in the north, Xuyan railway, Xinchang railway, Suhuai railway and Ningqi railway in the middle and Shanghai Nanjing intercity railway in the south. With a total length of about 305 km and a design speed of 250 km / h, it is expected to be completed and open to traffic in 2020. The main line of Lianhuai Yangzhen Railway (Lianhuai section) for this operation test is 117.543 km long, with Dongji station, Guanyun station, Guannan station, Lianshui station and Huai'an east station, and it meets with Xuyan railway at Huai'an east station The
operation test is to simulate the formal operation situation before the railway is opened, fully mobilize and coordinate the locomotive, crew, public works, power supply, electricity, apartment building, maintenance, communication, travel service and other units, fully operate, simulate the passenger handling, receiving and Dispatching Trains, jointly develop and solve the problems existing in the railway construction, joint commissioning, joint operation test stage The bank's reverse arrangement plan and cancellation number are cleared to ensure that the safe operation conditions are met and the opening task at the end of the year is completed on schedule
according to the person in charge of Jiangsu High Speed Railway Co., Ltd., the operation test will last about one month, and the operation conditions will be available before the end of the year. After the opening and operation, all five cities in Northern Jiangsu will enter the era of high-speed rail, which will play an important role in complementing the short board of high-speed rail construction in Northern Jiangsu, serving residents along the line, stimulating regional economic growth, and accelerating the integration of Northern Jiangsu into the Yangtze River Delta rapid traffic circle and economic circle
at present, there are 5 high-speed railways in Jiangsu Province, 1236km in total, which are under construction at the same time. By the end of this year, the number of new trains will be increased by 424km. At that time, all 5 cities in Northern Jiangsu will have access to high-speed railway. By 2020, the total mileage of high-speed rail in the province will reach 1804 kilometers, doubling compared with the current one, and will be in the top five of the country; by 2025, it will double again, more than 3500 kilometers.