SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

After Dalin railway station, the project has entered the comprehensive construction stage

2019-11-03| Pandatrips | News

"Hoisting, assembling, straightening and backfilling..." With the continuous issuance of instructions, on October 30, under the careful organization of technical personnel of China Railway First Bureau, Dali Lincang Railway set up the first catenary pillar in Weishan County, Dali Prefecture, Yunnan Province. At the same time, the construction of station buildings along the whole line has also been carried out simultaneously, marking that the post station project of Dali Lincang railway has entered the substantial and comprehensive construction stage, laying a solid foundation for the railway to meet the traffic conditions on schedule The post station project of

railway is the key link of "the last kilometer" of railway construction, which is directly related to the train operation safety after the completion of the railway and the experience of passengers on the Internet, communication and in and out of the station. The post station project of Dalin railway includes "four power" including communication, signal, traction power supply and power supply system, as well as station building construction and decoration, disaster prevention and safety monitoring system, etc The project has the characteristics of high technical content, strict standard requirements, difficult precision control, multiple cross interfaces and complex construction organization

"the railway catenary is the key equipment to provide power for the train. During the construction, we should ensure that the height difference between the Catenary line and the rail surface is 6m, and within 50m, the height difference cannot be greater than 20mm; the Catenary line is zigzag relative to the center line of the line, and the adjustment error does not exceed 30mm." Meng Zhen, manager of Dalin Railway Project Department of China Railway First Bureau Group, said

it is understood that the Dalin railway needs more than 7000 new OCS pillars, bridge steel pillars, etc., nearly 1600 kilometers of OCS, communication optical cables and high and low voltage lines, 26 communication towers and 17 substations While erecting the first catenary pillar, the station building construction of Lincang railway station 150 kilometers away from Weishan is also in full swing. The total construction area of new station buildings along Dalin railway is about 90000 square meters, and the construction sites are all over Dali and Lincang of Yunnan Province Fan Weiping, deputy director of Yunnan West Railway Construction Headquarters of China Railway Kunming Bureau Group Co., Ltd., said that since the start of construction at the end of 2016, all works of Dali Lincang railway have been advancing as planned, including 89% of bridges and 84% of tunnels. From today on, the construction of the whole post station project has entered the substantial and comprehensive construction stage

Dalin railway starts from Dali in the north, passes Weishan County of Dali Prefecture, crosses Lancang River, passes Yunxian County and reaches Lincang City. With a total length of about 202km, it is a class I single track electrified railway of national railway, with a target speed of 160km / h for passenger trains. When it is completed and opened to traffic, it will end the history of Lincang impassable railway in Yunnan Province.

Kunming

A total of 4364 trains

  • Kunming
kunming-chuxiong kunming-beijing kunming-beijingnan kunming-beijingxi kunming-guangzhounan kunming-chongqingbei kunming-chongqing kunming-chongqingxi kunming-guangzhoudong kunming-shanghai kunming-shanghainan kunming-shanghaihongqiao
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email