SIGN IN

Fogot Password?

or

SIGN UP

Have an account?
  • Home
  • Trains
  • Guides
  • USD
  • English
    • 繁體中文 (台灣)
    • 繁體中文 (香港)
    • English
    • 简体中文
  • SIGN IN/SIGN UP
  1. Home
  2. News

category

  • Train Guides
  • Travel Guides
  • Company News
  • News
  • Info

热门

  • China Train Luggage Regulation

  • How to Cancel a China Train Ticket

  • China Train Seat Types

  • China train types

  • How to Take Train in China?

  • How to read a China Train Ticket

  • How to collect train tickets in China

  • How to buy China train tickets

  • Can I purchase train ticket with the Symbol “·” Or “.” in name in China?

  • How to do when the ticket with the wrong name or passport?

Longhe of Lancang River Bridge, olive dam, China Laos kunwan Railway

2019-10-22| Pandatrips | News

In the early morning of October 18, 2019, the Lancang River Bridge on olive dam of China Laos Kunming (Ming) Wanxiang railway, located in Jinghong City, Xishuangbanna Dai Autonomous Prefecture, Yunnan Province, was successfully closed, marking a breakthrough in the construction of the last bridge across the Lancang River from the domestic section of China Laos Kunming Wanxiang railway to Mohan port, laying a solid foundation for the completion and opening of the railway on schedule.

The Lancang River Bridge of the olive dam of the a660201
China Laos railway will be closed successfully, and the installation of the upper stiffening steel pipe arch will be carried out later.
a660202

Lancangjiang bridge of olive dam is a continuous rigid frame bridge of arch reinforced prestressed concrete, with a total length of 495.65m, including a main span of 200m. The concrete consumption of the whole bridge is about 40000 cubic meters, and the steel consumption is nearly 6000 tons.

The closure of the main girder of the bridge has laid a foundation for the completion of the whole bridge construction. The whole bridge is planned to be completed in May 2020.

It is reported that the whole line of China Laos kunwan railway will be started at the end of 2016, and it is expected to be completed by the end of 2021. At that time, it is expected that the Kunming Laos Vientiane railway in Yunnan will achieve the "xi fa Chao Zhi", which will play a positive role in boosting the economic and social development of the two countries.

Kunming

A total of 4364 trains

  • Kunming
kunming-chuxiong kunming-beijing kunming-beijingnan kunming-beijingxi kunming-guangzhounan kunming-chongqingbei kunming-chongqing kunming-chongqingxi kunming-guangzhoudong kunming-shanghai kunming-shanghainan kunming-shanghaihongqiao
PandaTrips

PandaTrips provides China train tickets booking service,helps you enjoy your trip to China.

©Copyright 2017-2023 PandaTrips All Rights Reserved

浙ICP备2022032794号-2

Company

  • ABOUT
  • CONTACT
  • BOOKING RULE
  • PRIVACY

Website

  • TRAIN BOOKING
  • TRAIN SCHEDULES
  • TRAIN GUIDES
  • TRAVEL GUIDES

Follow us

  • Facebook
  • Line
  • WhatsApp
  • Email