The longest tunnel of Pumei railway, Lianhuashan tunnel, with a total length of 10497m
At 10:18 on the 18th, with a blast, two construction teams from Jianning county and Ninghua County joined in Lianhuashan tunnel, a control project of Pumei railway, successfully marking the smooth connection of the whole line of Lianhuashan tunnel, laying a solid foundation for the scheduled opening of Pumei railway. The
Lianhuashan tunnel, with a total length of 10497 meters and a maximum buried depth of 380 meters, connects Jianning county and Ninghua county. It is the longest and most complex control project in the Pumei railway. The main line of
Pumei railway is 162 km long from Jianning to Guan * Shan section. It is an important trunk connecting Gan Rui long railway, Changfu railway and Hefu railway. After completion, it will form a closed loop with Gan Rui long railway, long Zhang railway, Fu ha railway and Changfu railway, expand the radiation range of Ring Road, and bring the old revolutionary base area of Northwest Fujian into the ring road, ending Ninghua. There is no railway history in the old revolutionary areas of Northwest Fujian, such as Qingliu, which leads the people in the old revolutionary areas to embark on the fast track of development.