Lianhuashan tunnel of Pumei railway opened successfully
At 10:18 on October 18, with the sound of a gun, the Lianhuashan tunnel, a control project of Pumei railway, was successfully opened, and the two construction teams of China Railway 17th Bureau Group successfully met, which marked the smooth connection of the whole Lianhuashan tunnel, laying a solid foundation for the scheduled opening of PuMei Railway.
* Fujian mountain multiple risks. The main line of the Jianning section to the kweishan section of Pumei railway is 162 km long. The bridge and tunnel occupy more than 90% of the whole line. It is an important link connecting Gan Rui long railway, Changfu railway and Hefu railway. It is an important traffic project to speed up communication between the Yangtze River Delta, the Fujian and the Pearl River Delta.
, the author believes that after the completion of the Jianning railway to Jianguan mountain section, the closed loop will be formed with the Gan Ruilong, the Dragon * Zhang railway, the Fuzhou Xiamen railway and the Changfu railway, the radiation range of the ring road will be expanded, the northwest Fujian revolutionary base area will be included in the ring road, and a fast lane between Fujian and Guangdong will be added. With the history of railway, it is greatly convenient for people to travel, promote regional development, further promote the economic and social development of mountainous areas in Western Fujian, especially the old revolutionary areas, and lead the people in the old areas to the fast lane of development. (Wen / Peng Wangbo)