The first coal train on ho Ji railway arrived.
On September 29th, at 15 hours and 06 minutes, the first railway line of the whole railway line was completed, and the 84101 train arrived at the railway station, marking the formal integration of the railway into the north-south railway.
It is understood that in September 28th, the heavy-duty railway which was built and opened the longest mileage in the world was opened and operated in the world. At 6:48 on the same day, the 84101 train, loaded with nearly 5000 tons of coal, opened from the south to south station. The whole process ran for more than 1800 kilometers, and it took about 32 hours.
The Hao Ji railway is 1813.5 kilometers long, north of Inner Mongolia's Ordos City, and is located in Inner Mongolia, Shaanxi, Shanxi, Henan, Hubei, Hunan, Jiangxi and seven provinces and autonomous regions. Finally, it reaches the JiAn Railway Station of Beijing Kowloon Railway. It is the first class electrified railway of the state railway, with a designed speed of 120 kms, with an annual transportation capacity of more than 2 million tons.
The
Hao Ji railway is connected with the central Shaanxi Province, such as the Mengshan Shaanxi Gansu Ningxia energy area, E Xianggan and other central China regions. It is a major project of the national "12th Five-Year plan" and "medium and long term railway network planning". It is also an important part of the national strategic transport corridor and the comprehensive transportation system of China.
With the opening and operation of the railway, it will further improve the energy transport infrastructure, alleviate the shortage of coal resources, and ensure energy supply, which will play a major role in the industrial transfer of the coastal developed areas.