Operation time of first and last buses of Hangzhou Metro Line 5 in 2019
Brief Introduction of Hangzhou Metro Line 5
Hangzhou Metro Line 5 (Hangzhou Metro Line 5) is the fourth completed and operated subway line in Hangzhou. The first section of Hangzhou Metro Line was opened on June 24, 2019. The line signs are group blue. Up to June 24, 2019, Hangzhou Metro Line 5 started at Liangmu Road Station and ended at Shanxian Station in Yuhang District, Xihu District and Gongshu District. As of June 24, 2019, Hangzhou Metro Line 5 is about 17.76 km long, all of which are underground lines. There are 12 stations, including 3 transfer stations, and the AH drum train is used. On September 16, 2019, the rear section of Hangzhou Metro Line 5 realized "Dongtong"
Operation time of first and last buses of Hangzhou Metro Line 5
First and last bus operation time route station
Note: The first section of Metro Line 5, from Liangmu Road Station to Shanxian Station, is about 17.76 kilometers long. It is all underground. It passes through Gongshu District, Xihu District and Yuhang District from east to west. There are 12 stations, of which Sanba Station is a transfer station for Line 5 and Line 2. In the future, Harmony Station can transfer with Line 10 (under construction), Shanxian Station can transfer with Line 3. Line (under construction) transfer.